GAMECHANGE ENERGY

Live / Allowed — Approved for publication (as of 11 Sept 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 05 May 2026 filing date already counts against anyone who files later.

Record

Serial number
99805510
Mark type
Stylized text
Filed
05 May 2026
Attorney of record
Patrick J OShea

Goods and services

  • Class 006 — Metal goods: Metal hardware, namely, solar panel mounts; Metal structures for mounting solar panels; Mounting frames of metal for solar panels.
  • Class 009 — Scientific and electric apparatus: Utility-scale solar power plant solar trackers in the nature of photovoltaic solar modules that track the sun in order to optimize the production of energy from solar light; solar trackers in the nature of photovoltaic solar modules that track the sun in order to optimize the production of energy from solar light; Inverters; Photovoltaic inverters; Power inverters; AC to DC inverters; Electronic components for utility scale solar systems, namely, DC combiners, AC combiners, string inverters, wire solutions, wire harnesses, electric source circuit conductors, disconnect enclosures and insulation piercing connectors (IPC); Computer hardware and recorded software systems for monitoring and control of utility scale solar plants; Computer hardware with preinstalled software for monitoring and control of utility scale solar plants; Electronic controllers for monitoring and control of utility scale solar plants; Programmable electronic controllers for monitoring and control of utility scale solar plants
  • Class 042 — Scientific and technological services: Providing temporary use of on-line non-downloadable software for controlling movement and positioning of solar trackers.

Owner

Prior registrations

Prosecution history

  • 11 Sept 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 11 Sept 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 11 Sept 2026 — EXAMINER'S AMENDMENT ENTERED
  • 11 Sept 2026 — EXAMINERS AMENDMENT E-MAILED
  • 11 Sept 2026 — EXAMINERS AMENDMENT -WRITTEN
  • 10 Sept 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 10 Sept 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 10 Sept 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 09 Sept 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 09 Sept 2026 — NON-FINAL ACTION E-MAILED
  • 09 Sept 2026 — NON-FINAL ACTION WRITTEN
  • 08 Sept 2026 — ASSIGNED TO EXAMINER
  • 31 Jul 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 05 May 2026 — APPLICATION FILING RECEIPT MAILED
  • 05 May 2026 — NEW APPLICATION ENTERED

View this trademark record on Marksy