ELECTRIFY MARS

Live / Allowed — Published for opposition (as of 24 Feb 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 07 Jan 2026 filing date already counts against anyone who files later.

Record

Serial number
99582569
Mark type
Stylized text
Filed
07 Jan 2026
Published for opposition
24 Feb 2026
Attorney of record
Mark A Oathout

Goods and services

  • Class 035 — Advertising and business services: Employment recruiting services; Recruitment and placement of personnel in the field of electric power infrastructure
  • Class 037 — Building construction and repair services: Construction project management in the nature of construction supervision; Installation, maintenance and repair of electric power infrastructure facilities, foundations, substations, apparatus, and transmission lines; Construction of civil engineering structures; Construction of transmission lines; Technical consultation in the field of building construction; Construction of electric power infrastructure facilities, foundations, apparatus, piers, poles, towers, transmission lines, and electrical substations, and construction of foundations for installation of large-scale, high-voltage transmission lines, namely, drilling footings, excavation, wet-process or case concrete pier installations; Construction of underground structures; Construction of structures for installation of large scale, high-voltage transmission lines, namely, setting steel poles, and construction of lattice towers; Installation of utilities in the nature of conductors, and transmission lines in construction sites
  • Class 042 — Scientific and technological services: Electronic and electrical systems design services; Consulting services for others in the field of design, planning, and implementation project management of electric power infrastructure facilities, foundations, substations, apparatus, and transmission lines with testing for all of the foregoing; Engineering services in the field of electric power infrastructure facilities, foundations, substations, structures, apparatus, and transmission lines

Owner

Prosecution history

  • 24 Feb 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 24 Feb 2026 — PUBLISHED FOR OPPOSITION
  • 18 Feb 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 29 Jan 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 28 Jan 2026 — ASSIGNED TO EXAMINER
  • 07 Jan 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 07 Jan 2026 — APPLICATION FILING RECEIPT MAILED
  • 07 Jan 2026 — NEW APPLICATION ENTERED

View this trademark record on Marksy