TEXCELLENT
Live / Applied — Response to non-final action entered (as of 02 Apr 2026)
What this means for you
Not registered yet, but its 20 Nov 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99508265
- Mark type
- Stylized text
- Filed
- 20 Nov 2025
- Attorney of record
- Carey Worrell
Goods and services
- Class 037 — Building construction and repair services: Plumbing; HVAC contractor services; HVAC duct cleaning services; Installation of HVAC systems; Repair of household appliances and of residential heating, plumbing, air conditioning, and electrical systems; Comprehensive preventative maintenance service for electrical systems; Contractor services, namely, review of and remedial recommendations for building plumbing, electrical and mechanical systems for others; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services; Installation, maintenance and repair of fire, smoke and heat detectors; Installation, maintenance and repair of cooling and air-conditioning systems for temperature-controlled environments; Consultancy relating to the installation, maintenance and repair of heating, ventilation and air conditioning (HVAC) systems; Installation, maintenance and repair of heating, ventilation and air conditioning (HVAC) systems; Providing information relating to the repair or maintenance of consumer electrical appliances; Providing information relating to the repair or maintenance of electric lighting apparatus; Plumbing services; Maintenance of plumbing; Plumbing contractor services; Installation of plumbing; Plumbing maintenance advisory services; Plumbing repair advisory services
Owner
- Texcellent Heating & Cooling LLC, Deer Park, TX, US
Prosecution history
- 02 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 02 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 02 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 27 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 27 Mar 2026 — NON-FINAL ACTION E-MAILED
- 27 Mar 2026 — NON-FINAL ACTION WRITTEN
- 27 Mar 2026 — ASSIGNED TO EXAMINER
- 23 Mar 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 20 Nov 2025 — APPLICATION FILING RECEIPT MAILED
- 20 Nov 2025 — NEW APPLICATION ENTERED