SESAME DRN
Live / Allowed — Approved for publication (as of 02 Apr 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 20 Nov 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99506901
- Mark type
- Stylized text
- Filed
- 20 Nov 2025
- Attorney of record
- Staci R. DeRegnaucourt
Goods and services
- Class 006 — Metal goods: Mobile metal shelter structures, prefabricated buildings, portable office buildings, and storage containers, all of the foregoing for charging and refueling electric vehicles and drones
- Class 007 — Machines and machine tools: Electricity generators; Electric power generators for emergency use; Mobile electric power generators; nanogrid systems comprised primarily of electric power generators with integrated battery and hydrogen storage, sold as a unit, for providing electrical power; nanogrid systems comprised primarily of electric power generators with integrated battery and hydrogen storage, sold as a unit, for charging and refueling electric vehicles and drones; modular and movable power generator systems consisting of electric power generators with integrated battery and hydrogen storage, sold as a unit, for providing electrical power; modular and movable power generator systems consisting of electrical power generators with integrated battery and hydrogen storage, sold as a unit, for charging and refueling electric vehicles and drones
- Class 009 — Scientific and electric apparatus: charging and refueling stations for electric vehicles and drones
- Class 037 — Building construction and repair services: Charging and refueling station services for electric vehicles and drones
Owner
- Sesame Solar, Inc., Jackson, MI, US
Prosecution history
- 02 Apr 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 01 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 30 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 30 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 27 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 27 Mar 2026 — NON-FINAL ACTION E-MAILED
- 27 Mar 2026 — NON-FINAL ACTION WRITTEN
- 26 Mar 2026 — ASSIGNED TO EXAMINER
- 12 Feb 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 20 Nov 2025 — APPLICATION FILING RECEIPT MAILED
- 20 Nov 2025 — NEW APPLICATION ENTERED