FACTOR2 ENERGY

Live / Applied — New application — assigned to an examiner (as of 23 Mar 2026)

What this means for you

Not registered yet, but its 13 Nov 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
99495082
Mark type
Design + words
Filed
13 Nov 2025
Attorney of record
Uly S. Gunn

Goods and services

  • Class 037 — Building construction and repair services: Installation of geothermal plants; construction of power plants; construction of geothermal energy plants; construction of geothermal power plants; installation and maintenance of geothermal power plants; repair and maintenance of geothermal power plants
  • Class 039 — Transportation and storage services: Energy supply, in particular supply and distribution of electricity
  • Class 040 — Treatment of materials: Electricity generation by power plants; electricity generation; electricity generation from renewable sources; generation of energy; generation of renewable green energy; generation of clean energy; generation of electricity from geothermal energy; electricity production by geothermal power plants; electricity generation using carbon sequestration
  • Class 042 — Scientific and technological services: Technical design and planning of power plants; CO2-based geothermal energy technology development; consulting services on technology services in the field of electricity and energy supply; research in the field of nuclear power generation technology; conducting research and technical project studies in the field of natural energy resource utilization; research in the field of energy; engineering services in energy technology; research and development in the field of geothermal energy; technological consulting in the field of geothermal energy; engineering services in the field of geothermal energy; monitoring of geothermal power plants for quality control; technological services in the field of geothermal energy

Owner

Prosecution history

  • 23 Mar 2026 — ASSIGNED TO EXAMINER
  • 18 Mar 2026 — NOTICE OF DESIGN SEARCH CODE E-MAILED
  • 18 Mar 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 13 Nov 2025 — APPLICATION FILING RECEIPT MAILED
  • 13 Nov 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy