CLARKE ENERGY

Live / Allowed — Publication / registration review complete (as of 01 Apr 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 03 Nov 2025 filing date already counts against anyone who files later.

Record

Serial number
99475674
Mark type
Stylized text
Filed
03 Nov 2025
Published for opposition
21 Apr 2026
Attorney of record
John L. Cordani

Goods and services

  • Class 037 — Building construction and repair services: Installation, maintenance, repair and refurbishment of power generating equipment, energy plants, landfills and sewage gas installations; installation and maintenance of motors and engines not for land vehicles, electricity generators, compressors, valves, oil coolers for engines, silencers for motors and engines, vibration meters, power generating steam engine boilers, hydraulic and pneumatic controls, electric control panels, electronic control systems for machines and engines, electronic monitors and monitor modules for motors and engines, gas detectors, and electronic analyzers for measuring, testing and detecting fuel emissions; providing information and consulting in connection with the foregoing
  • Class 042 — Scientific and technological services: Scientific and industrial research in the field of electricity, gas and power generation; planning and design of electricity generating facilities, power generating facilities, landfills and sewage gas installations; testing, analysis and evaluation of motors and engines not for land vehicles, electricity generators, compressors for machines, electric compressors, valves, oil coolers for engines, silencers for motors and engines, vibration meters, power generating steam engine boilers, hydraulic and pneumatic controls, electric control panels, electronic control systems for machines and engines, electronic monitors and monitor modules for motors and engines, gas detectors, and electronic analyzers for measuring, testing and detecting fuel emissions to assure compliance with industry standards; engineering services in the fields of electricity generating stations, power stations, landfills, sewage gas installations, and energy plants; providing consultation and information in connection with the foregoing

Owner

Prior registrations

Prosecution history

  • 25 Mar 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 19 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 19 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 19 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 17 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 17 Mar 2026 — NON-FINAL ACTION E-MAILED
  • 17 Mar 2026 — NON-FINAL ACTION WRITTEN
  • 16 Mar 2026 — ASSIGNED TO EXAMINER
  • 03 Nov 2025 — APPLICATION FILING RECEIPT MAILED
  • 03 Nov 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 03 Nov 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy