SIPES ASPHALT & CONCRETE
Live / Allowed — Published for opposition (as of 21 Jul 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 09 Oct 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99435433
- Mark type
- Design + words
- Filed
- 09 Oct 2025
- Published for opposition
- 21 Jul 2026
- Attorney of record
- James David Johnson
Goods and services
- Class 037 — Building construction and repair services: Road paving and road construction services; asphalt paving services; paving contractor services; pavement striping; asphalt repair and maintenance services; asphalt sealcoating services; asphalt milling services; construction services, namely, concrete paving; construction of civil engineering structures by pouring, laying, and using concrete; concrete pouring and forming for buildings and other commercial or public concrete structures; concrete sealing; pavement marking services; installation of road safety features in the nature of speed bumps, speed humps, parking blocks, curbs, pipe bollards, and signs; construction of roads and underground utilities; construction services, namely, installation of athletic courts and fields; snow removal; grounds maintenance in the nature of snow and ice removal; soil erosion control services; street sweeping services
Owner
- Pave America, LLC, Warrenton, VA, US
- Pave America, LLC, Warrenton, VA, US
Prosecution history
- 08 Sept 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 08 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
- 21 Jul 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 21 Jul 2026 — PUBLISHED FOR OPPOSITION
- 15 Jul 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 22 Jun 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 09 Jun 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 09 Jun 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 09 Jun 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 09 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 09 Mar 2026 — NON-FINAL ACTION E-MAILED
- 09 Mar 2026 — NON-FINAL ACTION WRITTEN
- 27 Feb 2026 — ASSIGNED TO EXAMINER
- 25 Feb 2026 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 25 Feb 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED