FRAME FORWARD SYSTEMS

Live / Allowed — Approved for publication (as of 30 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 04 Oct 2025 filing date already counts against anyone who files later.

Record

Serial number
99427997
Mark type
Stylized text
Filed
04 Oct 2025
Attorney of record
Monica J. Stover

Goods and services

  • Class 006 — Metal goods: Metal roof trusses; Metal floor trusses; Wall panels of metal; Prefabricated metal walls; Metal decking; Metal decking boards; Railings of metal for balconies; Metal balcony enclosures; Metal trellises; Metal canopies; Steel sheets; Construction elements made of metal, namely, fabricated metal components for building foundations; Pre-fabricated metal building assembly kits; Metal building materials, namely, aluminum deck systems comprised of decking, railings, and panels, aluminum balconies, prefabricated metal wall assemblies, load bearing and non-load bearing metal walls, roof trusses, floor trusses, customizable structural metal studs and tracks, sheet metal fabrications, and aluminum sunshades, trellises, and canopies
  • Class 019 — Non-metallic building materials: Building materials, namely, composite panels composed primarily of nonmetal materials; Hardwood decking and flooring; Prefabricated non-metal walls; Non-metal roof trusses; Non-metal floor trusses; Wall panels not of metal; Floor boards of wood; Roofing, not of metal; Non-metal building materials, namely, roof trusses and floor trusses made from timber, wooden wall panels, wooden floors, non-metal roof systems comprised of trusses and panels, and engineered wood floor systems comprised of trusses and panels
  • Class 037 — Building construction and repair services: Building construction supervision; Building construction services; Building construction information; Custom building construction; Commercial building construction; Residential building construction; Building construction consultancy; Building construction advisory services; Construction and renovation of buildings; Building construction, remodeling and repair

Owner

Prosecution history

  • 30 Mar 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 28 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 27 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 27 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 28 Oct 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 28 Oct 2025 — NON-FINAL ACTION E-MAILED
  • 28 Oct 2025 — NON-FINAL ACTION WRITTEN
  • 28 Oct 2025 — ASSIGNED TO EXAMINER
  • 04 Oct 2025 — APPLICATION FILING RECEIPT MAILED
  • 04 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 04 Oct 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy