GILNA

Live / Allowed — Published for opposition (as of 17 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 18 Sept 2025 filing date already counts against anyone who files later.

Record

Serial number
99400915
Mark type
Design + words
Filed
18 Sept 2025
Published for opposition
17 Mar 2026
Attorney of record
ELIAS HANTULA

Goods and services

  • Class 007 — Machines and machine tools: Power operated metalworking machine tools, namely, boring tools; Power operated metalworking machine tools, namely, milling tools; Power operated metalworking machine tools, namely, turning tools; Inserts for power-operated milling machines; Numerically controlled machines and machine tools used for machining parts; Machine tools, namely, jaws for use in the precision clamping of work pieces; Machine tools, namely, vices for use in the precision clamping of work pieces; Machine tools, namely, clamps for use in the precision clamping of work pieces; Machine tools, namely, jigs for use in the precision clamping of work pieces; Milling cutters being parts of machines; Cemented carbide cutting tools; Cemented carbide tips for use with machine tools; Diamond-pointed metal-cutting tools; Reamers being machine tools; Precision machine tools, namely, hard metal tools, high speed steel (HSS) tools, carbide tools, ceramic tools, poly crystalline diamond (PCD) tools, and diamond-coated and diamond-uncoated tools, and hard metal tools, all for use in the cutting and forming of materials by others; Metalworking machine tools; Milling cutters for milling machines; Machine parts, namely, work holding fixtures for precision machining applications; Power tool parts, namely, collets; Metal clamps used for holding piece parts on machine tool tables; Machines and machine tools for the cutting and forming of materials; Machine tool holders; Machine tools for cutting, milling, and shaping metal component

Owner

Prosecution history

  • 17 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 17 Mar 2026 — PUBLISHED FOR OPPOSITION
  • 11 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 20 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 11 Feb 2026 — ASSIGNED TO EXAMINER
  • 10 Feb 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 18 Sept 2025 — APPLICATION FILING RECEIPT MAILED
  • 18 Sept 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy