IMAGENE

Live / Allowed — Published for opposition (as of 21 Jul 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 28 Aug 2025 filing date already counts against anyone who files later.

Record

Serial number
99363652
Mark type
Stylized text
Filed
28 Aug 2025
Published for opposition
21 Jul 2026
Attorney of record
Gordon E.R. Troy

Goods and services

  • Class 007 — Machines and machine tools: Reagent dispensing machines for industrial manufacturing use, namely, for dispensing fluids in the manufacture of lateral flow test strips; laminating machines for industrial manufacturing use, namely, for laminating lateral flow test strips; assembling machines for industrial manufacturing use, namely, for assembling lateral flow test strip cartridges; cutting machines for manufacturing use, namely, for cutting lateral flow test strips, all of the aforesaid machines with embedded software to control the apparatus; fluid dispensing nozzles and spray nozzles being parts of industrial reagent dispensing machines for use in the manufacture of lateral flow test strips; parts and replacement fittings for all of the aforesaid goods
  • Class 009 — Scientific and electric apparatus: Laboratory instruments for use in a laboratory as part of lateral flow test strip manufacturing, namely, reagent dispensers for dispensing preset portions of fluids, automated cutting equipment for cutting lateral flow test strips; machine vision systems for laboratory use, comprised of inspection cameras and electronic controllers, for detecting fluid dispensing in the manufacture of lateral flow test strips; recorded computer software for operating the foregoing goods; machine vision inspection machines for the physical inspection of fluid dispensing in the manufacture of lateral flow test strips, with embedded software to control the apparatus

Owner

Prosecution history

  • 08 Sept 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 08 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
  • 21 Jul 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 21 Jul 2026 — PUBLISHED FOR OPPOSITION
  • 15 Jul 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 22 Jun 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 30 May 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 28 May 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 28 May 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 24 May 2026 — NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
  • 24 May 2026 — EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
  • 24 May 2026 — COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION AUTOMATIC ENTRY
  • 24 May 2026 — EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED
  • 23 Feb 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 23 Feb 2026 — NON-FINAL ACTION E-MAILED

View this trademark record on Marksy