EQUIPMENTSHARE
Live / Allowed — Publication / registration review complete (as of 16 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 26 Aug 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99357751
- Mark type
- Design + words
- Filed
- 26 Aug 2025
- Published for opposition
- 07 Apr 2026
- Attorney of record
- Julie C. Scheipeter
Goods and services
- Class 037 — Building construction and repair services: Rental of construction, agricultural, landscaping, and industrial equipment, namely, earthmoving machinery, aerial lifts, material handling equipment, tool attachments, power tools, air compressors, hydraulic tools, fluid pumps and hoses, climate control units, welding and pipe fabrication tools, and safety equipment; Rental of HVAC and environmental control systems, power generation and distribution equipment, fluid pumping systems, and large air compressors, including professional on-site delivery, setup, and installation services
- Class 039 — Transportation and storage services: Rental of construction, agricultural, landscaping, and industrial equipment, namely, forklifts, utility vehicles, trailers and storage containers; Rental of mobile tool trailers equipped with construction and industrial tools, fasteners and hardware, adhesives and sealants, safety gear and personal protection equipment, and cleaning supplies, for temporary use at construction sites
- Class 043 — Restaurant and hotel services: Rental of construction, agricultural, landscaping, and industrial equipment, namely, lighting towers for temporary use on construction sites
Owner
- EQUIPMENTSHARE.COM INC, Columbia, MO, US
Prosecution history
- 01 Apr 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 10 Mar 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 09 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 09 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 09 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 09 Dec 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 09 Dec 2025 — NON-FINAL ACTION E-MAILED
- 09 Dec 2025 — NON-FINAL ACTION WRITTEN
- 09 Dec 2025 — ASSIGNED TO EXAMINER
- 30 Nov 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 30 Nov 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 26 Aug 2025 — APPLICATION FILING RECEIPT MAILED
- 26 Aug 2025 — NEW APPLICATION ENTERED