HYDROBLOK
Live / Applied — Non-final action mailed (as of 20 Jan 2026)
What this means for you
Not registered yet, but its 22 Aug 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99351711
- Mark type
- Stylized text
- Filed
- 22 Aug 2025
- Attorney of record
- Mansi Chauhan
Goods and services
- Class 006 — Metal goods: Metal fasteners, namely, screws, washers, brackets, and mounting hardware packaged and sold for attaching or reinforcing nonmetal building boards, modular construction elements, roofing or decking panels, shower pans, curbs, benches, and related waterproof construction products.
- Class 019 — Non-metallic building materials: Non-metal building materials, namely, cement-coated extruded polystyrene (XPS) foam or comparable composite boards and panels for use as wallboards, flooring underlayment, roofing, exterior decking, shower and bath backer boards, tile-ready pans, bases, curbs, ramps, benches, niches, shelves, corner pieces, shaft-liner panels, and modular construction systems for interior walls, ceilings, wet-area rooms, and exterior installations.
- Class 037 — Building construction and repair services: Technical support services, namely, technical advice related to the installation of waterproof building panels, modular construction systems, flooring and roofing assemblies, shower systems, and related accessories; Installation of waterproof building panels, modular construction systems, flooring and roofing assemblies, shower systems, and related accessories
Owner
- Hydroblok, Inc, Park City, UT, US
Prosecution history
- 20 Jan 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 20 Jan 2026 — NON-FINAL ACTION E-MAILED
- 20 Jan 2026 — NON-FINAL ACTION WRITTEN
- 20 Jan 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 20 Jan 2026 — NON-FINAL ACTION E-MAILED
- 20 Jan 2026 — NON-FINAL ACTION WRITTEN
- 20 Jan 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 20 Jan 2026 — NON-FINAL ACTION E-MAILED
- 20 Jan 2026 — NON-FINAL ACTION WRITTEN
- 14 Jan 2026 — ASSIGNED TO EXAMINER
- 13 Jan 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 22 Aug 2025 — APPLICATION FILING RECEIPT MAILED
- 22 Aug 2025 — NEW APPLICATION ENTERED