TENGYU TECH

Live / Allowed — Notice of allowance issued (as of 31 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 18 Aug 2025 filing date already counts against anyone who files later.

Record

Serial number
99344228
Mark type
Stylized text
Filed
18 Aug 2025
Published for opposition
03 Feb 2026
Attorney of record
Jaxen Eggleston

Goods and services

  • Class 009 — Scientific and electric apparatus: Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; Photovoltaic cells and modules; Photovoltaic solar panels for the production of electricity; Photovoltaic cells; Photovoltaic inverters; Photovoltaic modules; Power controllers; Electrical controllers; Wind turbine controller; Photovoltaic installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; Solar-powered battery chargers; Thin-film solar (TFS), vertical axis wind turbine (VAWT) and Hybrid TFS VAWT off-grid power and deep cycle battery storage systems composed of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures; Photovoltaic solar modules for production of electricity; Programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input; Solar-powered rechargeable batteries; Solar panels for the production of electricity; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; Solar panels for production of electricity

Owner

Prosecution history

  • 31 Mar 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 03 Feb 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 03 Feb 2026 — PUBLISHED FOR OPPOSITION
  • 28 Jan 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 07 Jan 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 07 Jan 2026 — ASSIGNED TO EXAMINER
  • 06 Jan 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 18 Aug 2025 — APPLICATION FILING RECEIPT MAILED
  • 18 Aug 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy