HR
Live / Applied — Response to non-final action entered (as of 26 Feb 2026)
What this means for you
Not registered yet, but its 12 Aug 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99333774
- Mark type
- Design + words
- Filed
- 12 Aug 2025
- Attorney of record
- Courtney Thompson
Goods and services
- Class 007 — Machines and machine tools: Construction equipment and replacement parts for construction equipment, namely, hydraulic excavators, loader backhoes, motor graders, wheel loaders, motor scrapers, hydraulic cranes, skid steer loaders, telehandlers, aerial lifting work platforms, trencher machines, compact crawler- tracked loaders, feller bunchers, harvesters, log loaders, delimbers, compact track loaders, crawler-tracked loaders, bulldozers, crawler pipelayers, mini excavators, midi excavators, crawler carriers, wheeled excavators; Radiators for motors and engines for articulated trucks, off highway trucks, crawler tractors, and wheeled tractors
- Class 012 — Vehicles: Components for articulated trucks, off highway trucks, crawler tractors, and wheeled tractors, namely, transmissions, land vehicle engines, engine cylinders for land vehicles, main hydraulic pumps, final drives being gearboxes for land vehicles, track spring assemblies, differentials, torque converters for land vehicles, oil coolers, brake groups, axles for land vehicles, engine power modules, cabs, suspension drop boxes, and vehicle brake control valves; all of the foregoing excluding components for automobiles and light duty trucks
- Class 035 — Advertising and business services: Online retail store services and retail store services featuring agricultural, construction, and industrial equipment and parts
Owner
- H&R Construction Parts & Equipment, Inc., Hudson, WI, US
Prosecution history
- 26 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 26 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 26 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 30 Dec 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 30 Dec 2025 — NON-FINAL ACTION E-MAILED
- 30 Dec 2025 — NON-FINAL ACTION WRITTEN
- 29 Dec 2025 — ASSIGNED TO EXAMINER
- 24 Dec 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 24 Dec 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 12 Aug 2025 — APPLICATION FILING RECEIPT MAILED
- 12 Aug 2025 — NEW APPLICATION ENTERED