DATATRICITY

Live / Applied — Response to non-final action entered (as of 21 Mar 2026)

What this means for you

Not registered yet, but its 25 Jul 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
99303575
Mark type
Stylized text
Filed
25 Jul 2025
Attorney of record
Mark A Oathout

Goods and services

  • Class 037 — Building construction and repair services: Construction, installation, maintenance or repair of infrastructure facilities for receiving, transmitting, distributing, switching, regulating, measuring or controlling the transmission or distribution, including by wireless means, of energy including electricity; Installation, maintenance or repair of systems and equipment for receiving, transmitting, distributing, switching, regulating, measuring or controlling the transmission or distribution, including by wireless means, of energy including electricity; Construction, installation, maintenance or repair of infrastructure facilities for transforming, accumulating, generating or storing energy including electricity; Installation, maintenance or repair of systems and equipment for transforming, accumulating, generating or storing energy including electricity; Installation, maintenance and repair of computer hardware.
  • Class 039 — Transportation and storage services: Transmission and distribution, including by wireless means, of electricity.
  • Class 040 — Treatment of materials: Production and generation of energy including electricity; Production and generation of energy including electricity utilizing renewable or non-renewable resources.

Owner

Prosecution history

  • 21 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 21 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 21 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 18 Dec 2025 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 18 Dec 2025 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 23 Sept 2025 — NOTIFICATION OF PRIORITY ACTION E-MAILED
  • 23 Sept 2025 — PRIORITY ACTION E-MAILED
  • 23 Sept 2025 — PRIORITY ACTION WRITTEN
  • 08 Sept 2025 — ASSIGNED TO EXAMINER
  • 26 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 25 Jul 2025 — APPLICATION FILING RECEIPT MAILED
  • 25 Jul 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy