CEQEL

Live / Allowed — Approved for publication (as of 02 Apr 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 23 Jul 2025 filing date already counts against anyone who files later.

Record

Serial number
99298738
Mark type
Stylized text
Filed
23 Jul 2025
Attorney of record
Jeffrey M. Becker

Goods and services

  • Class 037 — Building construction and repair services: Commissioning services during construction of a building, namely testing of facility equipment and software systems in the fields of data centers and advanced manufacturing; Commissioning services during construction of a building, namely, design review and criteria development of data center facility equipment and software systems, server hardware, server rack infrastructure, cooling systems, chilled water systems, computer room air conditioning units, computer room air handling units, power distribution units, uninterruptible power supply systems, electrical switchgear, backup generator systems, building management systems, and environmental monitoring systems, factory acceptance testing, site acceptance testing, integrated systems testing, performance verification, system performance evaluation, facility equipment optimization, energy efficiency improvements, and equipment documentation updates; Building systems and components commissioning services during construction of a building, namely, pre-design and design submittal and review of data center facility equipment and software systems, server hardware, server rack infrastructure, cooling systems, chilled water systems, computer room air conditioning units, computer room air handling units, power distribution units, uninterruptible power supply systems, electrical switchgear, backup generator systems, building management systems, factory acceptance and witness testing, site acceptance, equipment delivery and installation, equipment start-up and controls integration, functional testing, and integrated systems testing
  • Class 042 — Scientific and technological services: Recommissioning services for an existing building, namely, testing of facility equipment and software systems in the fields of data centers and advanced manufacturing; Recommissioning services for an existing building, namely, design review and criteria development of data center facility equipment and software systems, server hardware, server rack infrastructure, cooling systems, chilled water systems, computer room air conditioning units, computer room air handling units, power distribution units, uninterruptible power supply systems, electrical switchgear, backup generator systems, building management systems, and environmental monitoring systems, factory acceptance testing, site acceptance testing, integrated systems testing, performance verification, system performance evaluation, facility equipment optimization, energy efficiency improvements, and equipment documentation updates; Building systems and components commissioning services of an existing building, namely, pre-design and design submittal and review of data center facility equipment and software systems, server hardware, server rack infrastructure, cooling systems, chilled water systems, computer room air conditioning units, computer room air handling units, power distribution units, uninterruptible power supply systems, electrical switchgear, backup generator systems, building management systems, factory acceptance and witness testing, site acceptance, equipment delivery and installation, equipment start-up and controls integration, functional testing, and integrated systems testing

Owner

Prosecution history

  • 02 Apr 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 01 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 31 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 31 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 21 Jan 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 21 Jan 2026 — NON-FINAL ACTION E-MAILED
  • 21 Jan 2026 — NON-FINAL ACTION WRITTEN
  • 09 Dec 2025 — ASSIGNED TO EXAMINER
  • 01 Dec 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 23 Jul 2025 — APPLICATION FILING RECEIPT MAILED
  • 23 Jul 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy