MISSION CRITICAL MANUFACTURING
Live / Applied — Response to non-final action entered (as of 11 Mar 2026)
What this means for you
Not registered yet, but its 11 Jul 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99278484
- Mark type
- Design + words
- Filed
- 11 Jul 2025
- Attorney of record
- Roberta L. Christensen
Goods and services
- Class 006 — Metal goods: Metal hot and cold aisle containment structure, namely, racks, wall panels and doors for housing computer servers; Modular metal structure in the nature of multi trade racks for housing HVAC units, Plenum lines, technical water piping, hydronic piping, cable trays, bus bar, cooling units, fiber optic cables, connectors, electrical cable trays
- Class 009 — Scientific and electric apparatus: Metal mounting and storage racks for housing temperature-controlled computer servers
- Class 037 — Building construction and repair services: Application of protective coatings to metal and surface finishing of metals; Installation of multi trade racks for HVAC units, Plenum lines, technical water piping, hydronic piping, cable trays, bus bar, cooling units, fiber optic cables, connectors, electrical cable trays; Project management relating to construction planning and installation of multi trade racks
- Class 040 — Treatment of materials: Custom manufacturing of multi trade racks for HVAC units, Plenum lines, technical water piping, hydronic piping, cable trays, bus bar, cooling units, fiber optic cables, connectors, electrical cable trays
- Class 042 — Scientific and technological services: Structural engineering services; Architectural design; Project management in the field of architectural design and engineering
Owner
- GNB Global Inc., Selkirk, MB, CA
Prosecution history
- 11 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 11 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 11 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 11 Dec 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 11 Dec 2025 — NON-FINAL ACTION E-MAILED
- 11 Dec 2025 — NON-FINAL ACTION WRITTEN
- 01 Dec 2025 — ASSIGNED TO EXAMINER
- 17 Nov 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 17 Nov 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 11 Jul 2025 — APPLICATION FILING RECEIPT MAILED
- 11 Jul 2025 — NEW APPLICATION ENTERED