HB UTILITIES
Live / Applied — Non-final action mailed (as of 16 Nov 2025)
What this means for you
Not registered yet, but its 19 Jun 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99242844
- Mark type
- Design + words
- Filed
- 19 Jun 2025
- Attorney of record
- Aly Z. Dossa
Goods and services
- Class 037 — Building construction and repair services: Construction and construction management for gas infrastructure projects; Construction and construction management services for gas infrastructure projects, namely, steel pipeline construction, distribution system construction, installation of large diameter high-density polyethylene, joint utility trenching, station installation, welding and fabrication, cathodic protection, horizontal directional drilling, access road construction, site construction, erosion control, clearing and grubbing services, and earth work.; Construction and construction management for electrical infrastructure projects; Construction and construction management services for electrical infrastructure projects, namely, Underground Construction, Electric Conduit Installation, Power Cable Installation, Joint Trenching with Gas, Fiber, or other utilities, Horizontal Directional Drilling, Pad Placement, Vault and Handhole Installation, Access Road Construction, Site Construction, Erosion Control, and earth work.; Construction and construction management for telecommunications infrastructure projects; construction and construction management services for telecommunication infrastructure projects, namely, Fiber Conduit Installation, Open Trench Construction, Horizontal Directional Drilling, Fiber Optic Cable Installation, Surface Site Construction, Vault and Handhole Installation, Access Road Construction, Erosion Control, and Earth Work
Owner
- Badeco, Inc., Houston, TX, US
Prosecution history
- 11 Feb 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 11 Feb 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
- 16 Nov 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 16 Nov 2025 — NON-FINAL ACTION E-MAILED
- 16 Nov 2025 — NON-FINAL ACTION WRITTEN
- 07 Nov 2025 — ASSIGNED TO EXAMINER
- 27 Oct 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 27 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 19 Jun 2025 — APPLICATION FILING RECEIPT MAILED
- 19 Jun 2025 — NEW APPLICATION ENTERED