FLOWSURE

Dead / Abandoned — Abandoned — express abandonment (as of 28 Jan 2026)

What this means for you

This application is over — abandoned 27 Jan 2026. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
99242389
Mark type
Stylized text
Filed
19 Jun 2025
Abandoned
27 Jan 2026
Attorney of record
Anna King

Goods and services

  • Class 035 — Advertising and business services: Stock management services; business efficiency advice; advisory and consultancy services relating to the aforesaid
  • Class 037 — Building construction and repair services: Repair, installation, commissioning, maintenance and custom construction of fluid technology systems, liquid filling systems, pumping systems and flow control apparatus and instruments; On-site and off-site installation and repair services of fluid technology systems, liquid filling systems, pumping systems and flow control apparatus and instruments; custom construction of spare parts of fluid technology systems, liquid filling systems, pumping systems and flow control apparatus and instruments; Consultancy, provision of information and technical advisory services relating to repair, installation, and maintenance of fluid technology systems, liquid filling systems, pumping systems and flow control systems; On site project management relating to the repair, installation, commissioning, maintenance and customs construction of fluid technology systems, liquid filling systems, pumping system and flow control apparatus and instruments; consultation services, provision of information and preparation of reports relating to all the aforesaid
  • Class 041 — Education and entertainment services: Technical training services in the field of fluid technology systems, liquid filling systems, pumping systems and flow control apparatus and instruments; electronic publication services
  • Class 042 — Scientific and technological services: Professional consultations and advice relating to positive displacement pumps and fluid path technology; consultancy, provision of information and technical advisory services relating to positive displacement pumps and fluid path technology; research and feasibility studies relating to positive displacement pumps and fluid path technology; technical data analysis services relating to positive displacement pumps and fluid path technology; technical process efficiency analysis relating to positive displacement pumps and fluid path technology; engineering project management services relating to positive displacement pumps and fluid path technology; on site project management relating to positive displacement pumps and fluid path technology; preparation of engineering drawings relating to positive displacement pumps and fluid path technology; Engineering surveying relating to positive displacement pumps and fluid path technology; technical surveying relating to positive displacement pumps and fluid path technology; technical inspection services relating to positive displacement pumps and fluid path technology; Quality testing relating to positive displacement pumps and fluid path technology; process monitoring for quality assurance relating to positive displacement pumps and fluid path technology; industrial process development relating to peristaltic pumps and fluid path technology; Engineering testing relating to positive displacement pumps and fluid path technology; factory acceptance test (FAT) relating to positive displacement pumps and fluid path technology; Site Acceptance Test (SAT) relating to positive displacement pumps and fluid path technology; condition monitoring relating to positive displacement pumps and fluid path technology; technical supervision and inspection services relating to positive displacement pumps and fluid path technology; rental of positive displacement pumps and fluid path technology; inspection and audit of positive displacement pumps and fluid path technology

Owner

Prosecution history

  • 28 Jan 2026 — ABANDONMENT NOTICE E-MAILED - EXPRESS ABANDONMENT
  • 28 Jan 2026 — ABANDONMENT - EXPRESS MAILED
  • 27 Jan 2026 — TEAS EXPRESS ABANDONMENT RECEIVED
  • 12 Jan 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 12 Jan 2026 — NON-FINAL ACTION E-MAILED
  • 12 Jan 2026 — NON-FINAL ACTION WRITTEN
  • 06 Nov 2025 — ASSIGNED TO EXAMINER
  • 27 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 19 Jun 2025 — APPLICATION FILING RECEIPT MAILED
  • 19 Jun 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy