GIRISOLAR
Live / Registered — Registered (as of 27 Jan 2026)
What this means for you
Registered since 27 Jan 2026. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99241329
- Registration number
- 8116426
- Mark type
- Stylized text
- Filed
- 18 Jun 2025
- Published for opposition
- 09 Dec 2025
- Registered
- 27 Jan 2026
- Attorney of record
- Tianyu Ju
Goods and services
- Class 009 — Scientific and electric apparatus: Solar panels for production of electricity; Off-grid power and deep cycle battery storage systems comprised of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures for solar, thin-film solar (TFS), vertical axis wind turbine (VAWT) installations; Solar-powered rechargeable batteries; Accumulators, electric, for vehicles; Inverters; Electrical wiring devices in the nature of sockets, receptacles, switches, controllers incorporating tactile instructions and/or warnings for use by the blind; Programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input; Lithium iron phosphate batteries; Electric wires and cables; Battery chargers; Battery boxes; Distribution boxes for electrical power; Components for electrical mains in the nature of electric wires, connectors, circuit breakers, cables; AC/DC power supplies
Owner
- Shenzhen Jingri Optoelectronics New Energy Technology Co., Ltd., Shenzhen City, Guangdong Province, CN
- Shenzhen Jingri Optoelectronics New Energy Technology Co., Ltd., Shenzhen City, Guangdong Province, CN
- Shenzhen Jingri Optoelectronics New Energy Technology Co., Ltd., Shenzhen City, Guangdong Province, CN
Prosecution history
- 27 Jan 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 27 Jan 2026 — REGISTERED-PRINCIPAL REGISTER
- 09 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 09 Dec 2025 — PUBLISHED FOR OPPOSITION
- 03 Dec 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 06 Nov 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 06 Nov 2025 — ASSIGNED TO EXAMINER
- 26 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 18 Jun 2025 — APPLICATION FILING RECEIPT MAILED
- 18 Jun 2025 — NEW APPLICATION ENTERED