Serial 99235783
Live / Allowed — Published for opposition (as of 17 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 16 Jun 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99235783
- Mark type
- Design / logo
- Filed
- 16 Jun 2025
- Published for opposition
- 17 Mar 2026
- Attorney of record
- Joshua G. Gigger
Goods and services
- Class 019 — Non-metallic building materials: Concrete aggregate; gravel; concrete; concrete mix; aggregates for use as road base; aggregates for use as a subbase in construction and landscaping; rock for use in construction of retaining wall; sand; fill material, namely, gravel, rock, sand, and dirt for use in filling gaps between other materials during construction and landscaping; asphalt; architectural blocks, namely pavers; masonry blocks, namely pavers
- Class 037 — Building construction and repair services: Construction and maintenance of buildings; paving contractor services; road paving; excavation services; earthworks services in the nature of excavating for building construction; masonry; concrete pouring and forming for buildings and other commercial or public concrete structures; construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; concrete pumping services; land development services, namely, planning and laying out of residential and/or commercial communities; technical consultation in the field of building materials, namely, cementitious materials, asphalt and aggregates; installation of utilities in construction sites; installation of utilities in the nature of electricity, sewage, water, natural gas in construction sites; construction of roads, underground utilities, and housing pads
Owner
- Sunroc Corporation, Spanish Fork, UT, US
- Sunroc Corporation, Spanish Fork, UT, US
Prosecution history
- 17 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 17 Mar 2026 — PUBLISHED FOR OPPOSITION
- 11 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 20 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 05 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 05 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 07 Nov 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 07 Nov 2025 — NON-FINAL ACTION E-MAILED
- 07 Nov 2025 — NON-FINAL ACTION WRITTEN
- 04 Nov 2025 — ASSIGNED TO EXAMINER
- 23 Oct 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 23 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 Jun 2025 — APPLICATION FILING RECEIPT MAILED
- 16 Jun 2025 — NEW APPLICATION ENTERED