BRAKE DAMPER
Live / Applied — Suspended — suspension letter mailed (as of 14 Feb 2026)
What this means for you
Not registered yet, but its 06 Jun 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99221395
- Mark type
- Stylized text
- Filed
- 06 Jun 2025
- Attorney of record
- Geoffrey D. Aurini
Goods and services
- Class 006 — Metal goods: Construction materials of metal, namely, refractory construction materials of metal; construction elements made of metal, namely, fabricated metal components for building foundations; building materials of metal, namely, reinforcing materials of metal for building; metal vibration control materials for buildings and structures in the nature of metal bolts, metal washers, metal disc springs, and stainless steel plates; metallic building materials for seismic isolation in the nature of metal bolts, metal washers, metal disc springs, and stainless steel plates; metallic building materials for seismic control in the nature of metal bolts, metal washers, metal disc springs, and stainless steel plates; metallic building materials for seismic resistance in the nature of metal bolts, metal washers, metal disc springs, and stainless steel plates; vibration damping devices for buildings to mitigate wind and earthquake vibration being structural parts of metal
- Class 007 — Machines and machine tools: Earth moving machines; loading and unloading machines; machine elements, not for land vehicles, namely, shock prevention devices for machines
- Class 019 — Non-metallic building materials: Earthquake-resistant building or construction reinforcement materials in the nature of non-metallic friction plates; synthetic building materials in the nature of non-metallic friction plates; rubber building or construction materials in the nature of non-metallic friction plates; composite building materials for vibration control in the nature of non-metallic friction plates; building materials, not of metal in the nature of non-metallic friction plates; seismic isolation building materials excluding those made of metal in the nature of vibration damping devices for buildings to mitigate wind and earthquake vibration being structural parts of non-metal; vibration control building materials excluding those made of metal in the nature of vibration damping devices for buildings to mitigate wind and earthquake vibration being structural parts of non-metal; earthquake-resistant building materials excluding those made of metal in the nature of vibration damping devices for buildings to mitigate wind and earthquake vibration being structural parts of non-metal; rubber bearings for seismic isolation of buildings
- Class 037 — Building construction and repair services: Building construction; construction and maintenance of civil engineering structures; construction consultancy; maintenance of building equipment; repair or maintenance of earth moving machines and apparatus; repair or maintenance of construction machinery and equipment; repair or maintenance of seismic isolation devices; repair or maintenance of vibration control devices; rental of earth moving machines; rental of construction machines and apparatus; construction of buildings; seismic isolation construction for buildings; seismic control construction for buildings; seismic resistance construction for buildings; construction services, namely, installation of seismic isolation devices and earthquake resistant devices to buildings; building construction consultancy services; building construction supervision services
Owner
- OBAYASHI CORPORATION, Tokyo, JP
Prosecution history
- 20 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 20 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 20 Feb 2026 — TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
- 14 Feb 2026 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 14 Feb 2026 — LETTER OF SUSPENSION E-MAILED
- 14 Feb 2026 — SUSPENSION LETTER WRITTEN
- 05 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 05 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Feb 2026 — ASSIGNED TO LIE
- 30 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 30 Oct 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 30 Oct 2025 — NON-FINAL ACTION E-MAILED
- 30 Oct 2025 — NON-FINAL ACTION WRITTEN
- 27 Oct 2025 — ASSIGNED TO EXAMINER
- 06 Jun 2025 — APPLICATION FILING RECEIPT MAILED