EMERALD AI
Live / Allowed — Notice of allowance issued (as of 20 Jan 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 20 May 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99194512
- Mark type
- Stylized text
- Filed
- 20 May 2025
- Published for opposition
- 25 Nov 2025
- Attorney of record
- Christina M. Licursi
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable software for simulating integrated operation of power grids and large electrical loads and generating predictive control signals with virtual, real-time replicas of physical objects, systems and environments; Downloadable software employing artificial intelligence (AI)-driven optimization algorithms to co-optimize computing load, battery storage, and on-site or remote electrical generation
- Class 042 — Scientific and technological services: Software as a service (SaaS) services featuring artificial-intelligence and machine-learning algorithms for modeling, forecasting, and optimizing electricity consumption of data-center, cloud-computing, high-performance computing, and artificial intelligence workloads; Software as a service (SaaS) services featuring software for monitoring, analyzing, and controlling electric-grid conditions, demand-response events, and power-system reliability; Software as a service (SaaS) services featuring artificial intelligence (AI) software for real-time orchestration, scheduling, and power capping of computing workloads, battery systems, and other electrical infrastructure to meet grid constraints and computing performance targets; Software as a service (SaaS) services featuring software for telemetry collection and visualization from graphics processing units (GPUs), servers, facilities, and electrical or storage assets to safeguard and optimize data-center performance; Providing temporary use of non-downloadable cloud-based software for coordinating interactions between utilities, system operators, and large electricity consumers to increase grid reliability and unlock interconnection capacity; Platform as a service (PaaS) services featuring application programming interfaces (APIs) for integrating utility signals, market prices, and computational workload performance into automated power-aware workload-management systems; Cloud-computing software services featuring non-downloadable software for predictive maintenance, fault detection, and resilience analysis of data-center and power-infrastructure assets; Providing online non-downloadable software employing artificial intelligence (AI)-driven optimization algorithms to co-optimize computing load, battery storage, and on-site or remote electrical generation; Providing online non-downloadable software for providing dashboards that generate reports, alerts, and compliance documentation related to energy usage, computing workload performance, and grid-service participation
Owner
- Emerald AI, Inc., Washington, DC, US
- Emerald AI, Inc., Washington, DC, US
Prosecution history
- 20 Jan 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 25 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 25 Nov 2025 — PUBLISHED FOR OPPOSITION
- 19 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 27 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 24 Oct 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 24 Oct 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 24 Oct 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 08 Oct 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 08 Oct 2025 — NON-FINAL ACTION E-MAILED
- 08 Oct 2025 — NON-FINAL ACTION WRITTEN
- 02 Oct 2025 — ASSIGNED TO EXAMINER
- 26 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 20 May 2025 — APPLICATION FILING RECEIPT MAILED
- 20 May 2025 — NEW APPLICATION ENTERED