SPC
Live / Allowed — Notice of allowance issued (as of 24 Feb 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 16 May 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99189306
- Mark type
- Design + words
- Filed
- 16 May 2025
- Published for opposition
- 30 Dec 2025
- Attorney of record
- Amy F. Divino
Goods and services
- Class 037 — Building construction and repair services: Building construction services; Construction, maintenance, rehabilitation and repair of tunnels and underground structures, airports, bridges, railroads, subway stations, roadways, marine facilities, utility facilities, water treatment and pollution control facilities, sewer and drainage systems, walls, and other public civil infrastructure; Construction consultation, management and supervision services; Deep foundation construction services; Temporary support of excavation and bracing being excavation services; Underpinning services being foundation contractor services; Soil and rock excavation services; Bridge rehabilitation services being construction and repair of bridges; Resilience services being infrastructure construction services of flood barriers, walls, gates and other defenses against storms and sea-level rise.
Owner
- SPC Construction Co. LLC, Secaucus, NJ, US
- SPC Construction Co. LLC, Secaucus, NJ, US
Prosecution history
- 24 Feb 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 30 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 30 Dec 2025 — PUBLISHED FOR OPPOSITION
- 24 Dec 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 04 Dec 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 03 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 03 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 05 Oct 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 05 Oct 2025 — NON-FINAL ACTION E-MAILED
- 05 Oct 2025 — NON-FINAL ACTION WRITTEN
- 29 Sept 2025 — ASSIGNED TO EXAMINER
- 24 Sept 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 24 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 May 2025 — APPLICATION FILING RECEIPT MAILED