VERUSTRUCT

Live / Allowed — Notice of allowance issued (as of 10 Feb 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 07 May 2025 filing date already counts against anyone who files later.

Record

Serial number
99173251
Mark type
Stylized text
Filed
07 May 2025
Published for opposition
16 Dec 2025
Attorney of record
Julia Anne Matheson

Goods and services

  • Class 007 — Machines and machine tools: Robots for building construction
  • Class 019 — Non-metallic building materials: Prefabricated non-metal buildings; Prefabricated walls, not of metal; Prefabricated ready-to-assemble houses, not of metal
  • Class 035 — Advertising and business services: Project management services for others for business purposes in the fields of architecture, interior design, urban planning design; Project management for others for business purposes in the field of construction projects and architecture
  • Class 037 — Building construction and repair services: Assembly of prefabricated houses; Building construction consultancy; Building construction advisory services; Residential and commercial building construction; Rental of robots for building construction
  • Class 040 — Treatment of materials: Custom 3D printing of ready to assemble houses and building parts for others
  • Class 042 — Scientific and technological services: Residential building design services; Architectural design; Architectural consultancy; Architectural and engineering services; Consulting services in the field of architectural design; Providing information in the field of architectural design via a website; Computer aided design services relating to architecture; Advisory services for others in the field of building architecture; Providing information in the field of green building architecture via a website; Providing engineering information in the field of architectural design via a website

Owner

Prosecution history

  • 10 Feb 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 16 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 16 Dec 2025 — PUBLISHED FOR OPPOSITION
  • 10 Dec 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 18 Nov 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 17 Nov 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 17 Nov 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 17 Nov 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 23 Sept 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 23 Sept 2025 — NON-FINAL ACTION E-MAILED
  • 23 Sept 2025 — NON-FINAL ACTION WRITTEN
  • 23 Sept 2025 — ASSIGNED TO EXAMINER
  • 15 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 07 May 2025 — APPLICATION FILING RECEIPT MAILED
  • 07 May 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy