Live / Allowed — Approved for publication (as of 10 Sept 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 02 May 2025 filing date already counts against anyone who files later.

Record

Serial number
99167911
Mark type
Design + words
Filed
02 May 2025
Attorney of record
Jeffrey H. Greger

Goods and services

  • Class 037 — Building construction and repair services: Consigned construction being review of and remedial recommendations for high, medium and low voltage electrical systems for others in the field of renewable energy production; pipeline and underwater pipeline construction, maintenance and repair; installing offshore construction site utilities; electrician contractor services; cable laying; installation, maintenance and repair of telecommunication network hardware, apparatus and instruments, of communication appliances, of computer hardware installations, machinery, and electrical appliances; energy equipment installation and repair in the fields of solar, thermal, thermoelectric, wind energy and power generation; rental of construction equipment; installing high, medium and low voltage electricity facilities; construction of power plants in the field of hydro-electric, wave energy, solar, geothermal, and wind power; construction installation and maintenance of photovoltaic installations, solar panel power systems, wind turbines, wind power plants; dismantling power plants; installing leak prevention systems; installing and maintaining industrial pumps and pipes; maintenance of wind and solar plants
  • Class 040 — Treatment of materials: production of energy; generation of electricity from renewable sources; generation of electricity from wind energy; production of renewable green energy; consultancy in the field of green energy generation
  • Class 042 — Scientific and technological services: architectural design of energy power facilities; engineering surveying ; consultancy on civil and structural engineering projects and engineering technologies; engineering services and research and development consultancy in the engineering fields of electrical power, wind energy engineering, solar energy engineering, renewable energy engineering and energy transitioning; optic fiber electrical engineering; underwater exploration; software as a service (SAAS) services featuring software for monitoring high, medium and low voltage networks and wind or solar power plants; platform as a service (PAAS) featuring computer software platforms for use in controlling and monitoring high, medium and low voltage networks and wind or solar power plants; conducting technical project studies, namely conducting of feasibility studies in the field of renewable energy production; designing of energy production infrastructures; testing services for energy production installations; quality control services being quality control of goods and services; analysis for energy production installations in the nature of commissioning services, namely, quality control and systems review, to make sure systems and equipment are properly installed and operate in compliance with industry standards for performance and safety prior to being placed into service; monitoring of computer systems to detect breakdowns; remote monitoring of computer system operations, manufacturing processes, energy production installations and operations systems to detect breakdowns or faults

Owner

Prosecution history

  • 10 Sept 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 09 Sept 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 09 Sept 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 09 Sept 2026 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
  • 16 Jun 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 16 Jun 2026 — FINAL REFUSAL E-MAILED
  • 16 Jun 2026 — FINAL REFUSAL WRITTEN
  • 14 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 14 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 14 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 12 Jan 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 12 Jan 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 16 Oct 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 16 Oct 2025 — NON-FINAL ACTION E-MAILED
  • 16 Oct 2025 — NON-FINAL ACTION WRITTEN