P

Live / Applied — Final refusal mailed (as of 13 Jan 2026)

What this means for you

Not registered yet, but its 02 May 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
99167738
Mark type
Design + words
Filed
02 May 2025
Attorney of record
Adam S. Baldridge

Goods and services

  • Class 037 — Building construction and repair services: Heavy highway construction, clearing, excavation, right of way, and general construction contracting services; construction site preparation services, namely, excavation, pad preparation, rough and fine grading, site clearing, land clearing, subgrade preparation; utility trenching for water, sewer, gas, electrical, telecommunications and fiber optics; construction site preparation services; construction site preparation services being drilling for excavation purposes, roadbed and roadway subgrade preparation, slope grading, slope stabilization, wetland excavation and grading; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation; drainage excavation and water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs being canal, ditch and channel excavation and regrading; construction of levee and dike earthworks; construction of dam and flood control earthworks; reservoir basin excavation and shaping; stormwater management excavation in the nature of excavating retention and detention ponds, infiltration basins, culvert and spillway excavation; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation, slope grading, slope stabilization, drainage excavation, water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs, levee and dike earthworks, dam and flood control earthworks, reservoir basin excavation and shaping; stormwater management excavation in the nature of constructing retention and detention ponds; construction services in the nature of shoreline and bank shaping; Site development services for mining activities being mining for metals and minerals and quarry overburden removal, cut and fill earthmoving, soil stabilization and compaction; subgrade preparation for processing pads and haul roads; Construction services being site clearing, excavation, right of way, and general contracting; power infrastructure preparation and construction services to permit transmission and distribution electrical power; construction and installation of security walls around power stations; power infrastructure preparation being wind turbine and solar array pad excavation; substation and generation facility pad preparation; construction services in the nature of trenching for electrical, telecommunications and fiber optics; construction services in the nature of access road subgrade preparation, rough and fine grading, soil stabilization and compaction, slope grading and stabilization; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Disaster response and recovery services for manmade and natural disasters being emergency excavation for utility repairs; contaminated soil removal being excavation services; debris removal as part of construction site clearing; restoration services in the field of water, wind, or fire damage; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Wetland mitigation in the nature of shoreline and bank shaping in the nature of construction; installation of erosion and sediment control measures; construction of channels, ditches and ponds to restore hydrology; hazardous material spill site containment and cleanup; installation of temporary containment berms and liners; staging and overpacking of hazardous materials as part of hazardous waste cleanup operations; installation of temporary containment systems for hazardous materials
  • Class 039 — Transportation and storage services: Disaster-related hazardous materials management being hazardous materials warehousing; coordination of hazardous debris removal being transport services
  • Class 040 — Treatment of materials: Disaster-related hazardous materials management being detoxification of hazardous materials; environmental remediation excavation being treatment of soil; site decontamination in the nature of cleanup of hazardous material releases

Owner

Prosecution history

  • 26 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 26 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 26 Mar 2026 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
  • 13 Jan 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 13 Jan 2026 — FINAL REFUSAL E-MAILED
  • 13 Jan 2026 — FINAL REFUSAL WRITTEN
  • 22 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 22 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 22 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 25 Sept 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 25 Sept 2025 — NON-FINAL ACTION E-MAILED
  • 25 Sept 2025 — NON-FINAL ACTION WRITTEN
  • 22 Sept 2025 — ASSIGNED TO EXAMINER
  • 15 Sept 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
  • 15 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

View this trademark record on Marksy