PHILLIPS
Live / Applied — Non-final action mailed (as of 13 Jan 2026)
What this means for you
Not registered yet, but its 02 May 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99167714
- Mark type
- Stylized text
- Filed
- 02 May 2025
- Attorney of record
- Adam S. Baldridge
Goods and services
- Class 035 — Advertising and business services: Disaster response and recovery services for manmade and natural disasters; disaster debris collection, reduction, and disposal; hazardous tree, limb, and stump removal; damaged vehicle and vessel removal; waterway and marine disaster debris removal; coastal and waterway restoration; disaster-damaged structure demolition; private property debris removal and right-of-entry programs; disaster-related hazardous materials management; temporary office and housing preparation and installation; wetland mitigation
- Class 037 — Building construction and repair services: construction site preparation services being construction site preparation services, namely, excavation; pad preparation; rough and fine grading; site clearing; land clearing; subgrade preparation; utility trenching for water, sewer, gas, electrical, telecommunications and fiber optics; drilling for excavation purposes; roadbed and roadway subgrade preparation; slope grading; slope stabilization; wetland excavation and grading; and tree and stump removal as part of site clearing; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation; drainage excavation and water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs being canal, ditch and channel excavation and regrading; levee and dike earthworks; dam and flood control earthworks; reservoir basin excavation and shaping; stormwater management excavation including retention and detention ponds, infiltration basins, culvert and spillway excavation; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation; slope grading; slope stabilization; drainage excavation; water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs; levee and dike earthworks; dam and flood control earthworks; reservoir basin excavation and shaping; stormwater management excavation including retention and detention ponds; shoreline and bank shaping; Site development services for mining activities being mining and quarry overburden removal; cut and fill earthmoving; soil stabilization and compaction; subgrade preparation for processing pads and haul roads; Construction services being site clearing, excavation, right of way, and general contracting; power infrastructure preparation and construction services to permit transmission and distribution electrical power; construction and installation of security walls around power stations; power infrastructure preparation being wind turbine and solar array pad excavation; substation and generation facility pad preparation; trenching for electrical, telecommunications and fiber optics; access road subgrade preparation; rough and fine grading; soil stabilization and compaction; slope grading and stabilization; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Disaster response and recovery services for manmade and natural disasters being emergency excavation for utility repairs; environmental and remediation; contaminated soil removal; debris removal as part of site clearing; and restoration services in the field of water, wind, or fire damage; tree and stump removal as part of environmental remediation; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Wetland mitigation in the nature of shoreline and bank shaping; installation of erosion and sediment control measures; construction of channels, ditches and ponds to restore hydrology
- Class 039 — Transportation and storage services: Disaster-related hazardous materials management being hazardous materials warehousing; hazardous material spill site containment and cleanup; removal of contaminated soils; installation of temporary containment berms and liners; staging and overpacking of hazardous materials as part of cleanup operations; coordination of hazardous debris removal; site remediation services
- Class 040 — Treatment of materials: Disaster-related hazardous materials management being detoxification of hazardous materials; contaminated soil removal; environmental remediation excavation; site decontamination in the nature of cleanup of hazardous material releases; installation of temporary containment systems; and erosion and sediment control installation associated with cleanup operations
Owner
- Phillips Infrastructure Corp., Knoxville, TN, US
Prosecution history
- 13 Jan 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 13 Jan 2026 — NON-FINAL ACTION E-MAILED
- 13 Jan 2026 — NON-FINAL ACTION WRITTEN
- 22 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 22 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 22 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 25 Sept 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 25 Sept 2025 — NON-FINAL ACTION E-MAILED
- 25 Sept 2025 — NON-FINAL ACTION WRITTEN
- 22 Sept 2025 — ASSIGNED TO EXAMINER
- 02 May 2025 — APPLICATION FILING RECEIPT MAILED
- 02 May 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 02 May 2025 — NEW APPLICATION ENTERED