MAXIMO

Live / Allowed — Notice of allowance issued (as of 09 Dec 2025)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 25 Apr 2025 filing date already counts against anyone who files later.

Record

Serial number
99155346
Mark type
Word mark
Filed
25 Apr 2025
Published for opposition
14 Oct 2025
Attorney of record
Bassam N. Ibrahim

Goods and services

  • Class 007 — Machines and machine tools: Industrial robots; industrial robots for installing solar panels; industrial robots for assisting in construction of renewable energy construction projects; autonomous industrial robots for assisting in construction of renewable energy construction projects
  • Class 009 — Scientific and electric apparatus: Downloadable and recorded software for managing, optimizing, monitoring, and operating industrial robots in the field of renewable energy; downloadable and recorded software for accessing data, analytics and insights in the field of construction project management for renewable energy construction projects
  • Class 037 — Building construction and repair services: Rental of industrial robots for installing solar panels; rental of industrial robots for assisting in construction of renewable energy construction projects; installation, maintenance and repair of industrial robots; robot-assisted building construction services and installation of renewable energy generation equipment for renewable energy construction projects
  • Class 042 — Scientific and technological services: Design and development of industrial robots; providing online non-downloadable software for managing, optimizing, monitoring, and operating industrial robots in the field of renewable energy; providing online non-downloadable software for controlling navigation of industrial robots in the field of renewable energy; providing online non-downloadable software for accessing data, analytics and insights in the field of construction project management for renewable energy construction projects construction management

Owner

Prosecution history

  • 09 Dec 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 14 Oct 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 14 Oct 2025 — PUBLISHED FOR OPPOSITION
  • 08 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 16 Sept 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 16 Sept 2025 — ASSIGNED TO EXAMINER
  • 03 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 25 Apr 2025 — APPLICATION FILING RECEIPT MAILED
  • 25 Apr 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy