WBI
Live / Allowed — Notice of allowance issued (as of 09 Dec 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 21 Apr 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99147129
- Mark type
- Design + words
- Filed
- 21 Apr 2025
- Published for opposition
- 14 Oct 2025
- Attorney of record
- Patchen M. Haggerty
Goods and services
- Class 035 — Advertising and business services: Operation of a business for others, namely, operation of pipelines, natural gas dehydration systems, compressor stations, metering stations, and energy facilities
- Class 037 — Building construction and repair services: Laying, repair, maintenance, replacement and refurbishment of gas pipelines; Pipeline construction and maintenance; Construction planning; Construction of structures for the production of natural gas; Construction of structures for the storage of natural gas; Construction project management services
- Class 039 — Transportation and storage services: Public utility services; Public utility services in the nature of natural gas distribution; Transmission of oil or gas through pipelines; Storage, distribution, and transportation of liquefied petroleum gas; Transportation and storage of fuels
- Class 040 — Treatment of materials: Generation of power; Generation of power through operation of power generation equipment and facilities; Processing of oil and gas; Processing of natural gas; Processing of liquefied natural gas
- Class 042 — Scientific and technological services: Gas meter reading and data analysis; Pipeline inspection services; Design of pipelines; Custom design and engineering of pipelines, natural gas dehydration systems, natural gas compressor stations, gas metering stations, and energy facilities
Owner
- MDU Resources Group, Inc., BISMARCK, ND, US
- MDU Resources Group, Inc., BISMARCK, ND, US
Prior registrations
Prosecution history
- 09 Dec 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 14 Oct 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 14 Oct 2025 — PUBLISHED FOR OPPOSITION
- 08 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 14 Sept 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 13 Sept 2025 — ASSIGNED TO EXAMINER
- 28 Aug 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 28 Aug 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 21 Apr 2025 — APPLICATION FILING RECEIPT MAILED
- 21 Apr 2025 — NEW APPLICATION ENTERED