CERAPROTECT

Live / Allowed — Notice of allowance issued (as of 23 Dec 2025)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 10 Apr 2025 filing date already counts against anyone who files later.

Record

Serial number
99130253
Mark type
Stylized text
Filed
10 Apr 2025
Published for opposition
28 Oct 2025
Attorney of record
Robert S. Broder

Goods and services

  • Class 009 — Scientific and electric apparatus: Recorded data, namely, application software for operating heating installations; measuring, detecting and monitoring instruments, devices and regulators, namely, electrical controllers for heating installations; apparatus, instruments and cables for electricity, namely, fuel cells, batteries and solar cells for generating power; parts and accessories for all the aforesaid goods
  • Class 011 — Environmental control apparatus: Burners, boilers and heating apparatus, namely, heating boilers for oil, gas and solid fuels, fuel cell heating apparatus being heating apparatus for gaseous fuels, heat pumps, solar heating installations being solar collectors for heating and solar thermal air systems for heating purposes, hot water tanks being service water storage tanks with interior enameling, industrial heating boilers, biomass heat and power plants; industrial biogas treatment installations, namely, fixed-dome, floating-drum and bag reactors; heating, ventilating, and air conditioning and ambient purification equipment, namely, HVAC units and air purification units; parts and accessories for all the aforesaid goods, namely, thermostatic valves as parts of heating installations, flashback arrestors and reverse flow check valves, pressure regulators for gas pipes and lines, pipes for heating boilers, heat pumps, solar collectors and biomass heat plants
  • Class 037 — Building construction and repair services: Installation, cleaning, repair and maintenance of burners, boilers and heating apparatus

Owner

Prosecution history

  • 23 Dec 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 28 Oct 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 28 Oct 2025 — PUBLISHED FOR OPPOSITION
  • 22 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 26 Sept 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 24 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 24 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 24 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 17 Sept 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 17 Sept 2025 — NON-FINAL ACTION E-MAILED
  • 17 Sept 2025 — NON-FINAL ACTION WRITTEN
  • 06 Sept 2025 — ASSIGNED TO EXAMINER
  • 11 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 10 Apr 2025 — NEW APPLICATION ENTERED
  • 10 Apr 2025 — APPLICATION FILING RECEIPT MAILED

View this trademark record on Marksy