BLACKSTONE
Live / Allowed — Publication / registration review complete (as of 13 Jan 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 27 Mar 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99106283
- Mark type
- Stylized text
- Filed
- 27 Mar 2025
- Published for opposition
- 14 Apr 2026
- Attorney of record
- Arshil A Kabani
Goods and services
- Class 007 — Machines and machine tools: Centrifugal pumps; Reciprocating compressors; Centrifugal compressors; Steam turbines, other than for land vehicles; Gas turbine engines not for land vehicles and replacement parts; Engines not for land vehicles; Electric motors for machines; Electric motors, not for land vehicles; Mixing machines; Agitators for chemical processing; Rotating industrial equipment, namely, reciprocating compressors, centrifugal compressors, screw type centrifugal compressors, sliding vane-type centrifugal compressors, axial-type centrifugal compressors, industrial fans and blowers, turboexpanders, reciprocating pumps, centrifugal pumps, steam turbines, gas turbines not for vehicles, non-automotive gearboxes, industrial and stationary engines for machines, electric motors for machines, electricity generators, rotating drums, mixers, agitators, shakers and sizers, and vessels and exchangers
- Class 011 — Environmental control apparatus: Axial-flow fans for air-conditioning; Fans for air-conditioning apparatus; Oil purifying installations; Portable electric fans; Roof fans; Ventilating fans for industrial purposes
- Class 012 — Vehicles: Gearboxes; Steam turbines for land vehicles
Owner
- Blackstone Americas Ltd., Sherwood Park, AB, US
Prosecution history
- 08 Jan 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 07 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 07 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 07 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 07 Oct 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 07 Oct 2025 — NON-FINAL ACTION E-MAILED
- 07 Oct 2025 — NON-FINAL ACTION WRITTEN
- 07 Oct 2025 — ASSIGNED TO EXAMINER
- 06 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 27 Mar 2025 — APPLICATION FILING RECEIPT MAILED
- 27 Mar 2025 — NEW APPLICATION ENTERED