CP COQUI POWER
Live / Registered — Registered (as of 11 Nov 2025)
What this means for you
Registered since 11 Nov 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99089977
- Registration number
- 8020270
- Mark type
- Design + words
- Filed
- 18 Mar 2025
- Published for opposition
- 23 Sept 2025
- Registered
- 11 Nov 2025
- Attorney of record
- ERIKA L. JENKINS, ESQ.
Goods and services
- Class 037 — Building construction and repair services: Plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; Installation of renewable energy generation equipment; Installation and maintenance of solar energy based power plants; Installation, maintenance and repair of solar energy systems; Repair and maintenance of energy generating installations
- Class 040 — Treatment of materials: Consulting in the field of alternative energy generation; Energy generation services; Technical consultation in the field of production of solar energy
- Class 042 — Scientific and technological services: Consulting services in the fields of energy measurement to improve energy efficiency; Engineering services in the field of energy efficiency; Research and development in the field of energy; Research and development of environmentally friendly forms of energy and power; Technological planning and consulting services in the field of renewable alternative energy generation; Technological research in the field of renewable alternative energy generation.
Owner
- Energy Transition Capital LLC, San Juan, PR, US
- Energy Transition Capital LLC, San Juan, PR, US
- Energy Transition Capital LLC, San Juan, PR, US
Prior registrations
Prosecution history
- 11 Nov 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 11 Nov 2025 — REGISTERED-PRINCIPAL REGISTER
- 23 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 23 Sept 2025 — PUBLISHED FOR OPPOSITION
- 17 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 22 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 22 Aug 2025 — EXAMINER'S AMENDMENT ENTERED
- 22 Aug 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 22 Aug 2025 — EXAMINERS AMENDMENT E-MAILED
- 22 Aug 2025 — EXAMINERS AMENDMENT -WRITTEN
- 22 Aug 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 22 Aug 2025 — NON-FINAL ACTION E-MAILED
- 22 Aug 2025 — NON-FINAL ACTION WRITTEN
- 18 Aug 2025 — ASSIGNED TO EXAMINER
- 05 Aug 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED