BLUEPRINT BUILD
Live / Allowed — Notice of allowance issued (as of 25 Nov 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 10 Mar 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99075539
- Mark type
- Stylized text
- Filed
- 10 Mar 2025
- Published for opposition
- 30 Sept 2025
- Attorney of record
- AnaLisa Valle
Goods and services
- Class 009 — Scientific and electric apparatus: Kits for building teaching robots for educational, hobby or personal use comprised of electrical and mechanical componentry, namely, electric input sensors, indicator lights, electronic display interfaces, electric toggle switches, sensors for measuring distance, electric smart motors for machines, vision systems composed of cameras, LED lighting apparatus, lighting controls, optical lenses, electric image sensors, and image data processing equipment, parts of machines in the nature of modular truss systems composed of plastic mechanical snap and plate connectors, gears, pulleys, axles, and bearings, and also including downloadable software for designing, programming and operating said robots; Educational apparatus, namely, blocks used as teaching aids for visualization of science, math, engineering, and computer science literacy concepts
Owner
- Sphero, Inc., Greenville, TX, US
- Sphero, Inc., Greenville, TX, US
Prosecution history
- 25 Nov 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 30 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 30 Sept 2025 — PUBLISHED FOR OPPOSITION
- 24 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 27 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 18 Aug 2025 — EXAMINER'S AMENDMENT ENTERED
- 18 Aug 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 18 Aug 2025 — EXAMINERS AMENDMENT E-MAILED
- 18 Aug 2025 — EXAMINERS AMENDMENT -WRITTEN
- 14 Aug 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 14 Aug 2025 — NON-FINAL ACTION E-MAILED
- 14 Aug 2025 — NON-FINAL ACTION WRITTEN
- 11 Aug 2025 — ASSIGNED TO EXAMINER
- 10 Mar 2025 — APPLICATION FILING RECEIPT MAILED
- 10 Mar 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED