EDMI

Live / Allowed — Notice of allowance issued (as of 04 Nov 2025)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 07 Mar 2025 filing date already counts against anyone who files later.

Record

Serial number
99072829
Mark type
Stylized text
Filed
07 Mar 2025
Published for opposition
09 Sept 2025
Attorney of record
CHRISTINE B. REDFIELD

Goods and services

  • Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; Electric power distribution machines; Electric meters; Electrical energy utilization metering devices; Wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, remote metering systems, energy and utility systems; apparatus and instruments to measure, monitor, log, control and manage demand, capacity and reserves of electricity and power, namely, smart meters; Electricity meters; Meters for measuring electrical resistance; Meters for measuring electrical voltage; Meters for measuring values of electrical parameters; Downloadable electronic publications in the nature of newsletters, white papers, books, magazines, and brochures in the field of smart metering devices and solutions; Electronic devices and meters for measuring electric current
  • Class 042 — Scientific and technological services: Software as a service [SAAS] services featuring software for electricity, natural gas, and water metering solutions; software as a service [SaaS] services featuring software for monitoring electric equipment; design and development of computer software applications for electricity, natural gas, and water metering solutions; design and development of computer software application solutions for electric meters; design and development of computer software application solutions for monitoring electric equipment

Owner

Prosecution history

  • 04 Nov 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 09 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 09 Sept 2025 — PUBLISHED FOR OPPOSITION
  • 03 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 09 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 08 Aug 2025 — ASSIGNED TO EXAMINER
  • 28 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 07 Mar 2025 — APPLICATION FILING RECEIPT MAILED
  • 07 Mar 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy