WHEEL TEQ

Live / Allowed — Notice of allowance issued (as of 13 Jan 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 05 Mar 2025 filing date already counts against anyone who files later.

Record

Serial number
99067813
Mark type
Design + words
Filed
05 Mar 2025
Published for opposition
18 Nov 2025
Attorney of record
Daniel J. Smola

Goods and services

  • Class 003 — Cosmetics and cleaning preparations: metal cleaning preparations; metal polishing preparations
  • Class 007 — Machines and machine tools: wheel finishing systems comprised of a shot blasting machine for wheels, powder coating machine for wheels, ovens for heating coated wheels, and conveyor lines extending between the machines; commercial multi-stage systems comprised of a wheel washing machine including spray nozzles, brushes, a wash tank, and a roller platform and an evaporator system to evaporate waste water and allow for disposal of solid waste after cleaning; wheel finishing systems comprised of a commercial wheel polishing machine for high production capacity and limiting removal of material from the wheel; power-operated wheel hub and stud cleaning tool
  • Class 037 — Building construction and repair services: rental services for wheel finishing systems comprised of a shot blasting machine for wheels, powder coating machine for wheels, ovens for heating coated wheels, and conveyor lines extending between the machines; rental services for commercial multi-stage systems comprised of a wheel washing machine including spray nozzles, brushes, a wash tank, and a roller platform and an evaporator system to evaporate waste water and allow for disposal of solid waste after cleaning; rental services for wheel finishing systems comprised of a commercial wheel polishing machine for high production capacity and limiting removal of material from the wheel

Owner

Prosecution history

  • 13 Jan 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 18 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 18 Nov 2025 — PUBLISHED FOR OPPOSITION
  • 12 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 17 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 10 Oct 2025 — ASSIGNED TO EXAMINER
  • 23 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 23 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 23 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 19 Aug 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 19 Aug 2025 — NON-FINAL ACTION E-MAILED
  • 19 Aug 2025 — NON-FINAL ACTION WRITTEN
  • 06 Aug 2025 — ASSIGNED TO EXAMINER
  • 25 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 05 Mar 2025 — APPLICATION FILING RECEIPT MAILED

View this trademark record on Marksy