Serial 99061883
Live / Allowed — Notice of allowance issued (as of 04 Nov 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 28 Feb 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99061883
- Mark type
- Design / logo
- Filed
- 28 Feb 2025
- Published for opposition
- 09 Sept 2025
- Attorney of record
- Douglas R. Wolf
Goods and services
- Class 042 — Scientific and technological services: Design of software relating to 3D technology; research in the field of 3D computer software; engineering consultancy in the field of prediction and optimal management of building energy; professional engineering consultancy services in the field of energy efficiency in buildings; building management solution computer software research by means of a computer database; rental of laboratory robots for laboratory research and analysis; design and development of computer hardware and software in the field of machine learning, deep learning, and deep neural networks for use in building-installed systems, including temperature, humidity, heating, air conditioning, ventilation, parking, access control, digital signage and security systems; design and development of application software for metaverse; providing online non-downloadable software for analysis of building management computer data, namely, data relating to temperature, humidity, heating, air conditioning, ventilation, parking, access control, digital signage and security systems; platform as a service (PAAS) featuring computer software platforms for accessing and providing building management solution databases about temperature, humidity, heating, air conditioning, ventilation, parking, access control, digital signage and security systems; development, installation, and maintenance of computer software for remote internet access
Owner
- SAMSUNG C&T CORPORATION, Gangdong-gu, KR
- SAMSUNG C&T CORPORATION, Gangdong-gu, KR
Prosecution history
- 04 Nov 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 09 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 09 Sept 2025 — PUBLISHED FOR OPPOSITION
- 03 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 05 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 30 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 30 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 30 Jul 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 28 May 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 28 May 2025 — NON-FINAL ACTION E-MAILED
- 28 May 2025 — NON-FINAL ACTION WRITTEN
- 28 May 2025 — ASSIGNED TO EXAMINER
- 21 May 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 21 May 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 28 Feb 2025 — APPLICATION FILING RECEIPT MAILED