SP CONNECTORS
Dead / Abandoned — Abandoned — failure to respond (as of 13 Nov 2025)
What this means for you
This application is over — abandoned 31 Oct 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 99055945
- Mark type
- Stylized text
- Filed
- 25 Feb 2025
- Abandoned
- 31 Oct 2025
- Attorney of record
- Jeffrey M Goehring
Goods and services
- Class 009 — Scientific and electric apparatus: Audio cables; Audio adapter cables; Electrical cables for musical instruments; Cables for electrical or optical signal transmission; Cable jump leads; Electric wire and cable; Amplifiers; Audio speakers; Effects pedals for guitars; Electronic sound pickups for guitars and basses; Racks for amplifiers; Cases for amplifiers; Sound mixers with integrated amplifiers; Loudspeakers with built in amplifiers; Electronic effect pedals for use with sound amplifiers; Sound effect pedals for musical instruments; Electric connections and connectors; Microphones; Plug connectors; Telephone connectors; Connection cables; Power connectors; Musical instrument connectors; Fiber optic connectors; Electrical and electronic connectors; Power supply connectors and adaptors for use with portable electronic devices; Consumer electronic products, namely, audio amplifiers, audio speakers, audio receivers, electrical audio and speaker cables and connectors, audio decoders, video decoders, speakers, power conversion devices, power converters, and power inverters; Guitar effects processors; Electrical plug device enabling connection and disconnection of power and/or control cables
Owner
- Karim MESSADEK, Chanteloup-Les-Vignes, FR
Prosecution history
- 13 Nov 2025 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
- 13 Nov 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 30 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 30 Jul 2025 — NON-FINAL ACTION E-MAILED
- 30 Jul 2025 — NON-FINAL ACTION WRITTEN
- 30 Jul 2025 — ASSIGNED TO EXAMINER
- 10 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 25 Feb 2025 — APPLICATION FILING RECEIPT MAILED
- 25 Feb 2025 — NEW APPLICATION ENTERED