REMAN
Live / Applied — Final refusal mailed (as of 10 Dec 2025)
What this means for you
Not registered yet, but its 25 Feb 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99055934
- Mark type
- Stylized text
- Filed
- 25 Feb 2025
- Attorney of record
- Ricardo Yepez
Goods and services
- Class 037 — Building construction and repair services: Refurbishing services, namely, refurbishing of electrical apparatus in the nature of generator sets and power distribution equipment, namely, switchgear, circuit breakers, switchboards, motor control centers, automatic transfer switches, industrial control panels, and transformers; refurbishing of generator sets, switchgear, circuit breakers, switchboards, motor control centers, automatic transfer switches, industrial control panels, and transformers; engineering services for improving and uprating electrical equipment, namely, refurbishing of generator sets, switchgear, circuit breakers, switchboards, motor control centers, automatic transfer switches, industrial control panels, and transformers; and custom refurbishing services, namely, refurbishing of electrical equipment in the nature of generator sets, switchgear, circuit breakers, switchboards, motor control centers, automatic transfer switches, industrial control panels, and transformers.
- Class 042 — Scientific and technological services: Diagnostic testing and engineering services, namely, diagnostic services in the field of protective relays, protection and control devices, power factor and power quality assessment, and equipment failure
Owner
- Integrated Power Services LLC, Greenville, SC, US
Prosecution history
- 10 Dec 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 10 Dec 2025 — FINAL REFUSAL E-MAILED
- 10 Dec 2025 — FINAL REFUSAL WRITTEN
- 05 Nov 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 05 Nov 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Nov 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 05 Aug 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 05 Aug 2025 — NON-FINAL ACTION E-MAILED
- 05 Aug 2025 — NON-FINAL ACTION WRITTEN
- 30 Jul 2025 — ASSIGNED TO EXAMINER
- 10 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 25 Feb 2025 — APPLICATION FILING RECEIPT MAILED
- 25 Feb 2025 — NEW APPLICATION ENTERED