MCC
Live / Allowed — Notice of allowance issued (as of 11 Nov 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 12 Feb 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99038903
- Mark type
- Stylized text
- Filed
- 12 Feb 2025
- Published for opposition
- 16 Sept 2025
- Attorney of record
- Brittany L. Kulwicki
Goods and services
- Class 037 — Building construction and repair services: Extraction of gas; Maintenance and repair services for gas pipelines; Providing information relating to natural gas extraction; Repair or maintenance of pumps; Providing information relating to the repair or maintenance of pumps; Well drilling; Cleaning of wells
- Class 042 — Scientific and technological services: Remote monitoring services of gas collection systems, gas flare and pump stations, and surface emissions for quality control and scientific research purposes; Consultancy relating to inspection of natural gas flare and pump stations; Providing technology information relating to the oil and gas industry; Gas meter reading and data analysis; Testing the functionality of apparatus and instruments in the nature of gas equipment; Providing measurements and downhole telemetry while drilling gas wells; Design of landfill gas capture systems for others; Inspection services, namely, detection of leaks in landfill gas capture systems; Well logging
Owner
- MCC LFGSP Holdings, LLC, Wadsworth, OH, US
- MCC LFGSP Holdings, LLC, Wadsworth, OH, US
Prosecution history
- 11 Nov 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 16 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Sept 2025 — PUBLISHED FOR OPPOSITION
- 10 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 13 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 13 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 12 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 12 Aug 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 22 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 22 Jul 2025 — NON-FINAL ACTION E-MAILED
- 22 Jul 2025 — NON-FINAL ACTION WRITTEN
- 21 Jul 2025 — ASSIGNED TO EXAMINER
- 09 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 12 Feb 2025 — APPLICATION FILING RECEIPT MAILED
- 12 Feb 2025 — NEW APPLICATION ENTERED