MONITORING CONTROL & COMPLIANCE
Live / Registered — Registered (as of 10 Feb 2026)
What this means for you
Registered since 10 Feb 2026. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99038880
- Registration number
- 8139205
- Mark type
- Stylized text
- Filed
- 12 Feb 2025
- Registered
- 10 Feb 2026
- Attorney of record
- Brittany L. Kulwicki
Goods and services
- Class 037 — Building construction and repair services: Extraction of gas; Maintenance and repair services for gas pipelines; Providing information relating to natural gas extraction; Repair or maintenance of pumps; Providing information relating to the repair or maintenance of pumps; Well drilling; Cleaning of wells
- Class 042 — Scientific and technological services: Remote monitoring services of gas collection systems, gas flare and pump stations, and surface emissions for quality control and scientific research purposes; Consultancy relating to inspection of natural gas flare and pump stations; Providing technology information relating to the oil and gas industry; Gas meter reading and data analysis; Testing the functionality of apparatus and instruments in the nature of gas equipment; Providing measurements and downhole telemetry while drilling gas wells; Design of landfill gas capture systems for others; Inspection services, namely, detection of leaks in landfill gas capture systems; Well logging
Owner
- MCC LFGSP Holdings, LLC, Brecksville, OH, US
- MCC LFGSP Holdings, LLC, Brecksville, OH, US
Prosecution history
- 10 Feb 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 10 Feb 2026 — REGISTERED-SUPPLEMENTAL REGISTER
- 15 Jan 2026 — APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER
- 15 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 15 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 01 Oct 2025 — USE AMENDMENT ACCEPTED
- 18 Sept 2025 — AMENDMENT TO USE PROCESSING COMPLETE
- 18 Sept 2025 — USE AMENDMENT FILED
- 18 Sept 2025 — TEAS AMENDMENT OF USE RECEIVED
- 18 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 22 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 22 Jul 2025 — NON-FINAL ACTION E-MAILED
- 22 Jul 2025 — NON-FINAL ACTION WRITTEN
- 21 Jul 2025 — ASSIGNED TO EXAMINER
- 11 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED