BRINGING PREDICTABILITY TO AN UNPREDICTABLE ENVIRONMENT

Live / Allowed — Published for opposition (as of 10 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 11 Feb 2025 filing date already counts against anyone who files later.

Record

Serial number
99036499
Mark type
Stylized text
Filed
11 Feb 2025
Published for opposition
10 Mar 2026
Attorney of record
Mark B. Solomon

Goods and services

  • Class 037 — Building construction and repair services: Construction project management services in the field of construction of hydroelectric power generation equipment support structures; Building construction services in the field of hydroelectric energy and water control systems; Construction drafting services in the field of hydroelectric energy and water control systems; Construction planning services in the field of hydroelectric energy and water control systems; Maintenance and repair of structural and mechanical components of hydroelectric energy systems, water control systems, water containment systems, sea walls, and micro power grid systems; Construction services in the field of structural and mechanical water containment systems; Construction of civil engineering structures by forming precast concrete sea walls; Construction services, namely rehabilitation of structural and mechanical components of existing hydroelectric energy and water control systems; Construction services, namely, construction of structural and mechanical components of micro power grid systems; Construction consultancy in the fields of hydroelectric energy, water control systems, water containment systems, sea walls, and micro power grid systems
  • Class 042 — Scientific and technological services: Engineering design services in the field of hydroelectric energy and water control systems; Engineering design services in the field of sea walls; Engineering design services in the field of micro power grid systems; Engineering design services in the field of water containment systems; Maintenance and repair of software for use with hydroelectric energy systems, water control systems, water containment systems, sea walls, and micro power grid systems

Owner

Prosecution history

  • 10 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 10 Mar 2026 — PUBLISHED FOR OPPOSITION
  • 04 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 17 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 26 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 26 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 26 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 05 Nov 2025 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 05 Nov 2025 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 05 Aug 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 05 Aug 2025 — NON-FINAL ACTION E-MAILED
  • 05 Aug 2025 — NON-FINAL ACTION WRITTEN
  • 18 Jul 2025 — ASSIGNED TO EXAMINER
  • 10 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 11 Feb 2025 — APPLICATION FILING RECEIPT MAILED

View this trademark record on Marksy