HOUSINGTY

Live / Applied — First extension granted (statement of use) (as of 28 Jan 2026)

What this means for you

Not registered yet, but its 17 Jan 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
99010609
Mark type
Stylized text
Filed
17 Jan 2025
Published for opposition
19 Aug 2025
Attorney of record
Rong Xie

Goods and services

  • Class 006 — Metal goods: Building curtain walls made primarily of metal; Ceiling supports of metal; Cladding of metal for construction and building; Construction elements made of metal, namely, braces; Construction elements made of metal, namely, shores; Construction elements made of metal, namely, supports; Construction materials, namely, metal piles; Curtain walls of metal; Metal curtain walls; Metal expansion joints for floors and walls; Metal facade panels for construction purposes; Pre-fabricated houses of metal; Pre-fabricated metal architectural columns; Pre-fabricated metal building assembly kits; Pre-fabricated metal walls; Prefabricated buildings made substantially of metal; Prefabricated metal buildings; Prefabricated metal walls; Prefabricated ready-to-assemble houses of metal; Slabs of metal for building; Steel rods; Structural joint connectors of metal; Structure joint connectors of metal; Threaded metal rods; Wall claddings of metal for building; Wall panels of metal
  • Class 007 — Machines and machine tools: Concrete construction machines; Connecting rods for machines, motors and engines; Crawler cranes; Crawler-tracked loaders; Earth moving machines, namely, loaders; Electric jacks; Front end loaders; Hydraulic jacks; Lifting jacks other than hand-operated; Loading and unloading machines; Pneumatic jacks; Power jacks; Power-operated lifting and moving equipment, namely, pipe layers, fork lifts, telehandlers, and lifts; Robots for building construction; Skid-steer loaders; Wheel loaders
  • Class 016 — Paper goods and printed matter: Building boards, namely, paper boards; Non-metal slabs of paper-based materials
  • Class 019 — Non-metallic building materials: Building materials, namely, concrete-based slabs made using recycled glass; Non-metal building materials, namely, lightweight hard material boards, namely, fiberglass panels, floor boards, fascia, drywall and veneer; Cement slabs; Concrete building materials, namely, concrete blocks ; Concrete building materials, namely, concrete bricks ; Concrete building materials, namely, posts ; Concrete building materials, namely, slabs ; Concrete building materials, namely, panels ; Concrete retaining walls; Concrete walls; Concrete walls for building; Construction elements not made of metal, namely, braces; Construction elements not made of metal, namely, shores; Construction elements not made of metal, namely, supports; Construction material, namely, nonmetal exterior boards; Construction material, namely, nonmetal exterior panels; Construction materials in the nature of non-metal composite panels; Construction materials in the nature of non-metal composite panels composed primarily of lightweight hard materials ; Construction materials namely, energy conserving precast concrete slabs; Construction materials, namely, concrete slabs designed to increase energy efficiency and energy conservation; Construction materials, namely, energy conserving concrete slabs; Construction materials, namely, non-metal flooring materials; Construction materials, namely, non-metal materials for constructing floors; Construction materials, namely, non-metal piles; Non-metal casings for use in building or construction; Non-metal construction materials made from lightweight hard wood, drywall, or veneer, namely, {for decoration of wall, floor or ceiling}; Non-metal curtain walls; Non- metal expansion joints for floors and walls; Non-metal facade panels for construction purposes; Non-metal railings and facade panels for construction purposes; Non-metal railings for balcony; Non-metal slabs of light weight hard material, namely, cement, concrete, clay, slate, tiles and stone; Non-metal wall claddings for building; Nonmetal construction materials, namely, drilled and grouted pile foundations; Pre-fabricated houses, not of metal; Pre-fabricated nonmetal architectural columns; Pre-fabricated walls, not of metal; Prefabricated houses, not of metal; Prefabricated non-metal buildings; Prefabricated non-metal houses; Prefabricated non-metal walls; Prefabricated ready-to-assemble houses, not of metal; Prefabricated walls, not of metal; Rigid structural joint connectors, not of metal, for building purposes; Rigid structure joint connectors, not of metal, for construction purposes; Slabs of concrete designed to conserve energy; Slabs, not of metal, for building; Wall claddings, not of metal, for building; Wall panels not of metal
  • Class 037 — Building construction and repair services: Assembly of pre-fabricated houses; Assembly of prefabricated houses; Building construction information; Building construction services; Building construction supervision; Commercial building construction; Construction and installation of masonry walls and structures; Construction consultation; Construction information services; Construction of buildings; Construction of houses; Construction of modular buildings; Construction of modular homes; Construction of residential buildings; Construction of steel structures; Construction of prefabricated structures in the nature of prefabricated houses; Construction planning; Construction project management services; Construction project management services in the field of prefabricated structures ; Construction supervision; Construction, maintenance and repair of transportable and prefabricated buildings; Custom building construction; Providing construction information; Residential building construction; Steel structure construction works; Supervision of building construction

Owner

Prosecution history

  • 29 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 28 Jan 2026 — SOU EXTENSION 1 GRANTED
  • 28 Jan 2026 — SOU EXTENSION 1 FILED
  • 28 Jan 2026 — SOU TEAS EXTENSION RECEIVED
  • 14 Oct 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 19 Aug 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 19 Aug 2025 — PUBLISHED FOR OPPOSITION
  • 13 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 10 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 10 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 09 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 09 Jul 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 01 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 01 Jul 2025 — NON-FINAL ACTION E-MAILED
  • 01 Jul 2025 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy