FTS
Live / Allowed — Notice of allowance issued (as of 30 Sept 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 17 Jan 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 99010001
- Mark type
- Word mark
- Filed
- 17 Jan 2025
- Published for opposition
- 05 Aug 2025
- Attorney of record
- Utsav Mukherjee
Goods and services
- Class 007 — Machines and machine tools: Assembly line conveyor machinery; Assembly lines, namely, a series of machines for assembling batteries in successive stages; Belt conveyors; Belts for conveyors; Chain conveyors; Conveyers being machines; Electric welding machines; Hydraulic conveyors; Lifting installations for the transport of persons and goods; Lifting work platforms; Machine parts, namely, molds for use in the manufacture of batteries; Machines and lines composed thereof for the production of automobile parts, parts for the aforementioned machines, particularly foaming lines, die-cutting machines, molding presses, scoring machines, laminating machines, water jet cutting machines, milling machines, long fiber injection machines, parts for the aforementioned machines, particularly foaming tools, die-casting tools, die-cutting tools, molding tools, laminating tools; Machines and lines composed thereof for the production of automobile parts, technical textiles; Machines for conveying solids; Mechanical and hydraulic lifts; Metal parts and fittings for power-operated lifting equipment; Pneumatic conveyors; Power-operated lifting and moving equipment, namely, pipe layers, fork lifts, telehandlers, and lifts; Roller conveyors; Semiconductor manufacturing machines; Stands for machines; Stators being parts of machines; Tables specially adapted to hold powered machinery
Owner
- Jiangsu Fenghesheng Technology Group Co., Ltd., Kunshan Jiangsu,, CN
- Jiangsu Fenghesheng Technology Group Co., Ltd., Kunshan Jiangsu,, CN
Prosecution history
- 01 Mar 2026 — TEAS STATEMENT OF USE RECEIVED
- 30 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 05 Aug 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 05 Aug 2025 — PUBLISHED FOR OPPOSITION
- 30 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 29 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 28 Jun 2025 — ASSIGNED TO EXAMINER
- 23 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 19 Jan 2025 — NEW APPLICATION ENTERED