JENSEN INFRASTRUCTURE

Live / Applied — Non-final action mailed (as of 04 Nov 2025)

What this means for you

Not registered yet, but its 15 Jan 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98964432
Mark type
Word mark
Filed
15 Jan 2025
Attorney of record
Audrey A. Millemann

Goods and services

  • Class 002 — Paints: Seepage pit liners in the nature of a concrete moisture barrier coating
  • Class 006 — Metal goods: Metal parking curbs; Metal cattle guard rails; Metal light pole bases
  • Class 007 — Machines and machine tools: Wastewater pump stations and macerator vaults being macerator pumps; Coalescing oil separators
  • Class 009 — Scientific and electric apparatus: Junction boxes
  • Class 011 — Environmental control apparatus: Septic systems comprised of septic tanks, onsite treatment units, dosing tanks, holding tanks, seepage pit liners, wastewater distribution boxes; Dosing tanks in the nature of waste water purification units and marine sewage holding tanks; Wastewater distribution boxes in the nature of a thickening and dewatering machine for use in treatment of liquids including water, industrial effluent and sewage; Onsite wastewater treatment systems comprised of septic tanks, treatment units, media filters, and dispersal systems; Interceptors and separators in the nature of waste water purification units; Clarifiers and grease interceptors in the nature of waste water purification units; Sample boxes in the nature of waste water purification units; Sand-oil interceptors in the nature of waste water purification units; Hydrodynamic separators in the nature of water purification units; Stormwater interceptors in the nature of water purification units
  • Class 019 — Non-metallic building materials: Concrete utility vault; Non-metal light pole bases and non-metal trenches for use in construction of basement waterproofing system; Sewer and storm drain systems comprised of sanitary and storm manholes, drainage inlets and catch basins, concrete pipes, box culverts, and headwalls and wingwalls; Box culvert in the nature of prefabricated non-metal bridges; Concrete pipes, concrete retaining headwalls and wingwalls; Inlets, namely, nonmetal in-ground sewage and water run-off basins and Junction Boxes; Concrete drainage structures, namely, sanitary and storm manholes; Stormwater systems comprised of bioretention systems, biofiltration systems, screening separators, catch basin filters, volumetric separators, oil sand water separators, pump stations, connector pipe screens, curb inlet screens, and dry wells; Bioretention and biofiltration systems comprised of box culverts, bridge slabs, base slabs, access covers, interior modules, end walls, engineered media, concrete vaults, inlets, internal bypass pipes, mulch stabilization layers, bridging stone, and perforated underdrain pipe; Non-metal storm water dry wells; Diversion systems comprised of diversion vaults, diversion manholes, and risers; Transportation and parking infrastructure in the nature of non-metal barriers for parking areas and non-metallic barricades for highways; Highway barrier in the nature of non-metallic barricades for highways; Non-metal parking curbs; Concrete retaining walls and concrete fences; Non-metal bunker silos; Non-metal cattle guard rails; Non-metal prestressed concrete trellis posts
  • Class 021 — Housewares and glass: Feeding and Water Troughs

Owner

Prosecution history

  • 28 Jan 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 28 Jan 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 04 Nov 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 04 Nov 2025 — NON-FINAL ACTION E-MAILED
  • 04 Nov 2025 — NON-FINAL ACTION WRITTEN
  • 08 Oct 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 29 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 29 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 30 Jun 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 30 Jun 2025 — NON-FINAL ACTION E-MAILED
  • 30 Jun 2025 — NON-FINAL ACTION WRITTEN
  • 24 Jun 2025 — ASSIGNED TO EXAMINER
  • 15 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 15 Jan 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy