PARAWEB

Live / Allowed — Notice of allowance issued (as of 27 Jan 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 13 Jan 2025 filing date already counts against anyone who files later.

Record

Serial number
98957044
Mark type
Stylized text
Filed
13 Jan 2025
Published for opposition
02 Dec 2025
Attorney of record
Jeffrey Goehring

Goods and services

  • Class 019 — Non-metallic building materials: Erosion control mats for construction; Geogrids for road construction; Nonmetallic construction materials, namely, drain bases and grates; Geotextiles for the purposes of drainage, stabilizing inclines, recultivation, plant support, absorption, filtration, separation, stabilization and reinforcement of the soil; Reinforcing materials not of metal for building purposes; Civil engineering construction and building materials made wholly or principally of synthetics, namely, geostrips; reinforcing and drainage material made of synthetics used for construction purposes, namely, geosynthetic strips not of metal; civil engineering construction and building materials made wholly or principally of non-metallic materials, namely, geosynthetic grids or grilles or grates not of metal; reinforcing and drainage material made of non-metallic materials used for construction purposes, namely, geostrips
  • Class 022 — Cordage and fibers: Ropes and synthetic ropes; Cords made of textile fibres; Synthetic webbing; Twine for nets; String; Wrapping or binding bands, not of metal; Rockfall prevention nets, not of metal; Netting, not of metal or asbestos; Ropes and cords, none being of metal; synthetic webbing; twine and string; Bands, not of metal, for wrapping or binding or reinforcing or tethering or strapping or anchoring; and commercial nets

Owner

Prosecution history

  • 27 Jan 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 02 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 02 Dec 2025 — PUBLISHED FOR OPPOSITION
  • 26 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 30 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 25 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 25 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 25 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 01 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 01 Jul 2025 — NON-FINAL ACTION E-MAILED
  • 01 Jul 2025 — NON-FINAL ACTION WRITTEN
  • 23 Jun 2025 — ASSIGNED TO EXAMINER
  • 11 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 13 Jan 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy