GOLDEN WRAPPING

Live / Allowed — Notice of allowance issued (as of 06 May 2025)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 04 Jan 2025 filing date already counts against anyone who files later.

Record

Serial number
98937562
Mark type
Word mark
Filed
04 Jan 2025
Published for opposition
11 Mar 2025
Attorney of record
RAN HE

Goods and services

  • Class 019 — Non-metallic building materials: Nonmetallic construction materials, namely, drain bases and grates; Waterproof membrane for use as a floor underlayment; Glass for building; PVC roofing membrane; Bitumen paper for building; Waterproof fabric used in building construction for protection against floods; Refractory construction materials, not of metal; Building panels, not of metal; Gypsum for use as building materials; Grout; Wall panels not of metal; Building material, namely, plastic webbing material used to reinforce bituminous waterproofing sheets; Non-metal roofing; Wall claddings, not of metal, for building; Reinforcing materials not of metal for building purposes; Mortar for building; Waterproofing membranes for roofing, floors and walls; Non-metal roof coverings; Plastic conduit for drainage; Building materials, namely, non-metal countertops for further installation; Armor-plating, not of metal, for building; Non-metal building materials, namely, soffits; Erosion control mats for construction; Roofing comprised primarily of tensile fabric membranes; Bituminous coatings for roofing; Building timber; Geotextiles; Asphalt roofing paper; Non-metal building material, namely, fascia; Asphalt; Polymeric bitumen emulsion for waterproofing buildings; Cement; Partitions being non-metallic building materials; Mortar mix; Multilayer panels of plastic for use in building; Roofing membranes; Non-metallic drainage pipes

Owner

Prosecution history

  • 21 Oct 2025 — TEAS STATEMENT OF USE RECEIVED
  • 06 May 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 11 Mar 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 11 Mar 2025 — PUBLISHED FOR OPPOSITION
  • 05 Mar 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 19 Feb 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 18 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 18 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 18 Feb 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 10 Feb 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 10 Feb 2025 — NON-FINAL ACTION E-MAILED
  • 10 Feb 2025 — NON-FINAL ACTION WRITTEN
  • 07 Feb 2025 — ASSIGNED TO EXAMINER
  • 06 Feb 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 04 Jan 2025 — NEW APPLICATION ENTERED

View this trademark record on Marksy