POWERWAY
Live / Registered — Registered (as of 02 Dec 2025)
What this means for you
Registered since 02 Dec 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98929125
- Registration number
- 8046626
- Mark type
- Design + words
- Filed
- 30 Dec 2024
- Published for opposition
- 14 Oct 2025
- Registered
- 02 Dec 2025
- Attorney of record
- Alex Patel
Goods and services
- Class 037 — Building construction and repair services: construction consultancy; provision of information relating to vehicle repair; building inspection in the course of building construction; building construction supervision; building construction; laying of cable; installation and maintenance of solar thermal installations; installation and repair of lighting apparatus; installation of power generating apparatus; repair or maintenance of semiconductor manufacturing machines and systems; machinery maintenance and repair; installation and maintenance of photovoltaic installations; machinery installation; building construction supervision services for building projects; repair of roofing; electric appliance installation and repair; battery charging service for motor vehicles; vehicle battery charging; rental of battery chargers; building maintenance and repair; charging of electric vehicles; rental of portable power chargers; rental of battery chargers for electric mobility scooters; rental of portable battery chargers for electric bicycles
Owner
- Powerway Renewable Energy Co., Ltd, Foshan, Guangdong, CN
- Powerway Renewable Energy Co., Ltd, Foshan, Guangdong, CN
- Powerway Renewable Energy Co., Ltd, Foshan, Guangdong, CN
Prosecution history
- 02 Dec 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 02 Dec 2025 — REGISTERED-PRINCIPAL REGISTER
- 14 Oct 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 14 Oct 2025 — PUBLISHED FOR OPPOSITION
- 08 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 12 Sept 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 12 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 11 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 11 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 18 Jun 2025 — NOTIFICATION OF PRIORITY ACTION E-MAILED
- 18 Jun 2025 — PRIORITY ACTION E-MAILED
- 18 Jun 2025 — PRIORITY ACTION WRITTEN
- 12 Jun 2025 — ASSIGNED TO EXAMINER
- 03 Jun 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 03 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED