HIBCTR
Live / Allowed — Notice of allowance issued (as of 23 Sept 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 25 Dec 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98922142
- Mark type
- Stylized text
- Filed
- 25 Dec 2024
- Published for opposition
- 29 Jul 2025
- Attorney of record
- Jiannan Lyu
Goods and services
- Class 009 — Scientific and electric apparatus: Analog to digital converter (ADCs); Analogue to digital converters; Computer apparatus, namely, a converter that superimposes an Ethernet signal on an existing cable; Converters, electric; Direct current converters; Electric converters; Electric power converters; Electronic controllers for use with power converters; Frequency converters; Telecommunications equipment, namely, fiber-optic transceivers, fiber optic repeaters, converters and optimizers, wave division multiplexers, free-space optics transmission systems, switches including Ethernet switches and routers, fiber-to-the-home and ethernet-over-VDSL access aggregators, terminators and repeaters, and remote presence management products, namely, switches, and console, alarm, sensor and power management devices; Television and video converters; Current converters; DC/AC power converters; Digital photo image converters; Digital to analog converters (DACs); Digital to analogue converters; Safety equipment, namely, a lifeline system for horizontal or vertical movement to which a worker is attached for protection against fall hazards, composed of line tension indicator, turnbuckle, bars, anchors, harnesses, lanyards, cables, anchorage connectors, carabiners, lifelines, stanchions, shock absorber
Owner
- Jinjiang Kaxindun Trading Co., Ltd., Jinjiang, CN
- Jinjiang Kaxindun Trading Co., Ltd., Jinjiang, CN
Prosecution history
- 09 Jan 2026 — TEAS STATEMENT OF USE RECEIVED
- 23 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 29 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 29 Jul 2025 — PUBLISHED FOR OPPOSITION
- 23 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 25 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 25 Jun 2025 — EXAMINER'S AMENDMENT ENTERED
- 25 Jun 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 25 Jun 2025 — EXAMINERS AMENDMENT E-MAILED
- 25 Jun 2025 — EXAMINERS AMENDMENT -WRITTEN
- 10 Jun 2025 — ASSIGNED TO EXAMINER
- 27 Apr 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 26 Dec 2024 — NEW APPLICATION ENTERED