ECOXIS CONSULTANTS
Live / Registered — Registered (as of 11 Nov 2025)
What this means for you
Registered since 11 Nov 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98908913
- Registration number
- 8018232
- Mark type
- Stylized text
- Filed
- 18 Dec 2024
- Published for opposition
- 23 Sept 2025
- Registered
- 11 Nov 2025
- Attorney of record
- Victoria Walker
Goods and services
- Class 042 — Scientific and technological services: Architectural design services in the field of residential and commercial buildings; Engineering design services; Land development services, namely, planning and laying out of residential and commercial communities, engineering services for facility assessments, namely, building and property condition assessment, energy auditing audits, sustainability, namely, consulting and reporting services related to sustainable building practices and energy efficiency, and code compliance, namely, architectural and engineering design consulting to ensure adherence to building and environmental codes; Consulting services in the field of architectural design and engineering; Construction planning and management; Environmental services, namely, technical consulting services in the field of environmental science; Residential building design
Owner
- ECOXIS CONSULTANTS Inc., Mississauga, ON, CA
- ECOXIS CONSULTANTS Inc., Mississauga, ON, CA
- ECOXIS CONSULTANTS Inc., Mississauga, ON, CA
Prosecution history
- 11 Nov 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 11 Nov 2025 — REGISTERED-PRINCIPAL REGISTER
- 23 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 23 Sept 2025 — PUBLISHED FOR OPPOSITION
- 17 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 25 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 12 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 12 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 12 Aug 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 10 Jun 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 10 Jun 2025 — NON-FINAL ACTION E-MAILED
- 10 Jun 2025 — NON-FINAL ACTION WRITTEN
- 04 Jun 2025 — ASSIGNED TO EXAMINER
- 28 Apr 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 18 Dec 2024 — NEW APPLICATION ENTERED